Reality: Zero miles of high-speed rail deployed.
Many such cases.
Edit: Downvote all you want, that still won't make the rails appear, lmao.
Reality: Zero miles of high-speed rail deployed.
Many such cases.
Edit: Downvote all you want, that still won't make the rails appear, lmao.
Think about it, rail is an eminently standardized piece of infrastructure that has existed for more than a century and millions of kilometers have been laid out. Don't you think _some_ effort has gone into automating the process and making it predictable?
Here is a (french) example of laying up to 2km of continuously-welded rail a day: https://www.youtube.com/watch?v=o97SB8c7Ezk
This really underscores Klein and Thompson's argument: this infrastructure sclerosis seems to be a uniquely American problem.
This review of Klein and Thompson's book sums it up pretty well:
Adding a kilometre of subway track in the United States now costs twice what it does in Japan or Canada, and six times what it does in Portugal; in the past fifty years, the inflation-adjusted cost of a mile of interstate highway has tripled
https://www.newyorker.com/magazine/2025/03/10/abundance-ezra...
Hundreds of tons of concrete is no longer a "brilliant idea," it's physical infrastructure designed for the purpose of installing rails.
This is a normal thing done every day around the world, since track has to be periodically re-ballasted and sleepers eventually upgraded and rails renewed as normal maintenance. It truly is the easy bit.
Rail overhead line equipment and signalling systems are much more tricky work, but the rail laying itself is easy. The vast majority of the work though is building cuttings, embankments, bridges, viaducts and stations.
Fundamentally the problem is that most of the land they want to use is owned by someone else, and that means every single parcel is a potential, and often actual, legal fight. In theory this is what eminent domain is supposed to accomplish, but people dislike eminent domain more than they like high speed rail. Well meaning but onerous environmental regulations don't make it any quicker either. When your rail plan goes through the nesting site of an endangered bird species or something that's another big legal fight.
Even though the measure passed with a majority of the population, you have a situation where thousands of people have effectively a personal veto over it. Either their rights get trampled or the project doesn't happen.
The article doesn't make right of way seem like a major issue, are there areas where that is blocking construction?
Incidentally, Caltrain is now up to high-speed rail standards except for grade crossing elimination. All welded rail on concrete ties, 25KV electrification, and the new commuter trains are capable of 125MPH, although they are not run that fast.