Reducing the draw from the well at time X, leaves more available at time Y. In this way, the capital cost is reasonably preserved and your correction is offered.
--It's not exactly the same thing as flux ---I haven't verified the relative losses here of delaying utilizing the available heat, but rather am assuming the OP is correct about what I believe to be their point*