If I did all the work myself, I might be able to cut the price down to $150 a square foot, because materials alone are expensive, and it would take me at least a year of working on it do so. Now I’m “only” spending $300,000, and effectively paid myself $100,000 to build the house.
None of this includes the cost of land.
Only graded the footing, no excavation under footprint of house, so one day rental backhoe, under $1k for entire dirt work. Poured concrete (300 bags) by hand one bag at a time without concrete truck. Transported blocks and built block crawlspace wall then ran dimensional lumber across, no engineered lumber or piers.
Frame light wood structure to minimum code following irc so no engineering nor architect. Plumbing almost all on single wall with only toilet/tub/sink/sink. All electric appliances, I diy connected to power grid running my own secondary mains.
These last year's prices I think if you exclude utilities I'm at about 70/sqft, you could probably do 50 with reclaimed material and a flatter roof. I double timed after work a couple years but took off maybe 3 months so well under 100k lost wages.