My eye is twitching remembering a fiasco where someone ordered concrete assuming 1 cubic metre required 1 ton of concrete.
Ever since that I’ve assumed it’s about 2.5 tons per cubic metre. This works much better.
Ever since that I’ve assumed it’s about 2.5 tons per cubic metre. This works much better.
It’s a silly way to buy a lot of concrete, but does help someone without a tow bar.