One of these units blew at one point. We had 4 and only needed two running, so no big deal. The company who managed the whole thing (Swiss) came to replace it. Amazing job, they had to put it on small rollers, like industrial roller skates, then embed hooks in the walls at each corridor junction, and slowly winch the thing along, it was like watching the minute hand of a clock.
Then the whole process in reverse to bring in the new one. Was fascinating to watch. The guy in charge was a giant, built like a brick outhouse. They knew their stuff.