https://news.ycombinator.com/item?id=41601443
Microsoft's commitment allows Constellation Energy to restart the 819 MW nuclear fission reactor at Three Mile Island. This reactor operated without problems for approximately 45 years and was switched off in 2019.
The other reactor at Three Mile Island (880 MW) melted harmlessly in 1979 due to operator error. That reactor will never be restarted: https://en.wikipedia.org/wiki/Three_Mile_Island_accident
Clean baseload power is extremely valuable.
Nuclear fission is the only clean baseload power source mature enough to be widely adopted. Today there are 440 nuclear fission reactors operating in 32 countries. Having used fission reactors for 70 years, we know how to build them and operate them at 95%+ efficiency (https://www.energy.gov/ne/articles/what-generation-capacity). For example, Vogtle 3 and 4 have been operating at 100% of their capacity.
In contrast, solar and wind are not baseload power solutions. They are intermittent and unreliable, fundamentally weather dependent. If you have battery backup sufficient for time T and the weather doesn't cooperate for time T+1, your data center is offline.
Furthermore, even a day or two of battery backup eliminates the cost advantage of solar and wind. As a last resort, fossil fuel backup plants can be built, but building them is costly and using them is dirty. See Germany's power grid for an embarrassing real-world example.
Solar + wind + batteries is an intrinsically unreliable, unacceptable solution. Please see Yann LeCun's comments, reflecting Meta's view on this topic: https://news.ycombinator.com/item?id=41621097