SpaceX Falcon 9 booster lost in landing failure
spaceflightnow.com
spaceflightnow.com
In any case, SpaceX was on a streak for so long but these past few months they got a failure (-ish?) on their second stage and now this. With so many launches every week it's bound to happen sometime, I guess.
Once is happenstance. Twice is coincidence. But they definitely want to be alert, because a third time would suggest that something else is going on. Perhaps a slip in manufacturing standards.
I wouldn't get too worked up, given that 23 launches is utterly unprecedented. Still, it's odd.
I think it’s just a weird coincidence. But they’re also launching so often that it was bound to happen.
I think they also had some 200+ consecutive successful landings which is wildly impressive.
A bit like the airplane industry they are trying to copy -- make these things routine....
- 8 humans,
- 2 of the 31 active GPS satellites,
- 574 Starlink satellites, and
- 40 of Starlink competitor OneWeb's satellites.
https://en.wikipedia.org/wiki/List_of_Falcon_9_first-stage_b...
Valves have a hard job, since they have to survive in extreme cold and heat and not deform too much, if at all.
SpaceX is probably one of the few companies on earth that can detect metal fatigue well. I suppose at some point they'll also have the most reliable valves on the market. Material that has done 23 transitions between extreme hot/cold is something no other company probably has, and is a gold mine of data for materials people.
Given that this is this rocket's 23rd flight, was this really a "loss" for SpaceX or was the rocket already basically paid off.
I realize launches for Starlink make this a more complicated number.
Price estimates of a first stage are in the 15-20m dollar range so every reused stage will net them about that (minus refurbishing costs) as a bonus.
I could have sworn I remember there being an article about them doing something for the Government and they wanted a fresh rocket so it cost more. But maybe I am remembering wrong.
So roughly first rocket at cost and then if they are successful (which is for sure an incentive) the rest is profit above maintenance cost.
They've always made money on the bulk of their first flights but the income is much better for later flights where the booster is already paid for.
SpaceX already dominated pricing with its cheap flights before reuse, built on cheap costs from vertical integration and advanced manufacturing processes (plus skilled workforce) but reuse made winning every launch contract even more lucrative and today no one else can possibly match them.
More importantly reuse lets them fly often as they refurb in about a month and have a fleet of about 16 boosters. That lets them hit 3 flights a week when the operation is going smoothly and that is how something like Starlink can be profitable despite requiring over 100 launches a year. The cadence is ridiculous and that could not be had without reuse at anywhere close to SpaceX's workforce sizing today.
I did not realize that they had a booster with that many launches.
I'm sure they expect that a long-lasting reusable rocket will eventually fail.
SpaceX must be eager to study the wreckage to see where to improve their reconditioning process.