Where do folks actually live in those areas? Is it that a 30min drive north to San Fran becomes a 30min drive south to San Jose?
Where do folks actually live in those areas? Is it that a 30min drive north to San Fran becomes a 30min drive south to San Jose?
The dynamics of travel will dramatically change multiple industries, save for if the status quo establishment and industrial complexes through regulatory capture prevent the rapid expansion of the paradigm shift in transport that Boring Company is rapidly developing; the technology of which Elon needs for his Mars colony, and so it'll happen and be developed as far as is determined to be necessary to maximize its utility and safety.
Not to mention the large delta between what was promised versus what was delivered. There's probably a good case for fraud, if it were not for the fact that the purchasers want to save face they could probably sue.
However, transit advocates need to realize that the experience of individual users _does_ matter.
Might as well argue he’s going to give all his employees time machines to go buy $AAPL in the 90s as part of their comp plan. Would also get downvoted.
A claim you make with no supportive arguments.
My comment is packed with critical thought. Maybe you're just lacking understanding to unpack it? Or are you too arrogant to not think that you know all?
And then ridiculous ad hominem that you think was clever enough to actually waste time to type out; what work do you have that you hate that you're procrastinating from working on?
I'm really curious if you know what sycophancy means, and if so, how exactly my comment is benefitting me? I think it's more likely you're jealous of Elon's success, have past trauma from personal work experiences you're projecting onto him, and taking it out on anyone who notes his successes and extrapolates to estimate where his projects will lead to.
I don't think you know what ad hominem nor sycophancy mean.
Have a good week!
The true is, there's a huge gap between what was promised early on and what they seem to be able to do. After a certain point people start calling it "bs" and have no patience for those repeating the initial claims.
If it's not I encourage you to go look at the stellar success of the boring company in places like Las Vegas and reconsider your assessment of the future.
For a map and list of the organizational insanity, see https://www.seamlessbayarea.org/blog/transitagencieslist (2019).
(Large tech companies like Google, Meta, Apple avoid all this by using private employee-only shuttles which take the freeway where possible).
BART from the East Bay is in the process of being extended to downtown SJ (latest estimate: "2036", they are still debating single-bore vs twin-bore tunnel, to save money in construction).
It's not fair to just blame BART vs Caltrain though, there are multiple cities that need to cooperate with other too: as we saw in the neverending saga of the CA High-Speed Rail project, people wanted a midpeninsula stop, but no midpeninsula city (Redwood City vs Palo Alto vs Mountain View) wanted to be the one to incur the increased traffic and enormous construction disruption from underground multistorey parking lots, so it was dropped.
At least, Caltrain electrification is finally promised, fall 2024: https://www.caltrain.com/projects/electrification/project-be... (more reliable (=> fewer breakdowns and delays), less noise, cleaner air quality)
(Both are still faster by far than driving, particularly during rush hour.)
CalTrain: <https://www.caltrain.com/media/22502/download>
BART's Green Line (Daly City - Beryessa / North San Jose) departs every 20 minutes from 4:55 am though 7:36 pm (southbound) and 4:59 am through 6:49 pm (northbound):
<https://www.bart.gov/sites/default/files/2024-01/January%201...>
Melbourne, Australia has been running a project since 2015 – scheduled to continue until at least 2030 – to remove at-grade intersections (or "level crossings" as we call them) on suburban rail lines. They've already removed 83, and by 2030 plan to have removed 110. I'm not sure of the total cost, but I'd say in the ballpark of US$5-10 billion. The removal is done by a combination of elevating the rail line, trenching the rail line, and leaving the rail line at the same level but building road bridges over it – adopting whichever solution is most feasible and cost-effective for any given at-grade intersection. The project is run and paid for by the state government, with the federal government contributing some of the funding.
Australia's State of Victoria: population close to 7 million, economy almost US$300 billion (Gross State Product), annual state government budget around US$70 billion. California: population close to 40 million, economy almost US$4 trillion (GSP), annual state government budget of almost US$300 billion. If Victoria can afford it, California can too.
As an X employee, if you had optimized your commute around the mid-market area, you could be living less than 45 minutes away on a single mode of public transit, but it could double or triple to commute to the new X offices. Any time you have a transfer with the commuter systems in the Bay Area, it's going to be a clusterfuck from time to time.
Living in SF and working in South Bay sucked for me, when I did that, for that reason in particular.
I would guess a large portion of the individuals in the SF office would live within SF/East bay and have a fairly reasonable commute going to the SF office. I am not sure how far Bart goes south now but typically you would take Caltrain so thats a 45min ride from SF to Palo Alto. Then tack on however long it takes you to get to Caltrain. Easily a 1hr commute.
Caltrain's main issue is that trains run every hour. (with 1 super slow train in the middle). Miss a train, and you're screwed.