London, Paris, Seoul Show Commuting Power of Fast Regional Rail
bloomberg.com
bloomberg.com
https://www.ejrcf.or.jp/jrtr/jrtr63/pdf/14-21_web.pdf (PDF)
The article also notes that the Parisian RER was inspired by Tokyo, and throws casual shade by noting that public transport in Paris at 3 billion trips per year is just a small fraction of Tokyo's 15 billion trips.
The Paris metro area is 11 million, while Tokyo's is 38 million. So the difference isn't as huge as it initially seems, and I'd bet Paris will start catching up with the Grand Paris Express (4 new automated lines, the first one of which is a loop in the metro area and will be very high capacity) and all other related projects (there are like 10 different trams being built in various parts of the metro area, a new airport express, a bunch of BRTs, RER extension and hell even a cable car).
Edit: did some digging, and I'm not buying the number for Paris. Surprisingly the total number of trips isn't a number referenced in Ile de France Mobilités (the organising authority)'s Open Data [1], and they're the only ones that would have all of it, instead of just metro/some RERs/etc.
Statista say that for 2022 (year still impacted by Covid), there were 1.3 billion trips on the metro alone [2]. And the metro is a small part, RERs cover much wider territory and have much higher capacity, and there are of course a bunch of trams and a few hundred bus lines. And there are also people commuting by regular intercity trains or even TGVs, but they're a small minority.
According to OMNIL (observatory of mobility in Ile de France), there's a total of 4.1 billion trips on public transit (including metro, RER, Transilien regional trains, trams, buses and night buses) in Ile de France for 2023 [3].
4.1 billion vs 15 billion for less than 1/3 of the population means that Tokyo and Paris actually aren't all that far off.
Per capita, this makes for 394 trips per year per inhabitant for Tokyo, and 372 for Paris. Of course both cities receive lots of tourists and business travel, so this is skewed somewhat. And as I said, Paris is undergoing a massive expansion in number and length of lines, so it will surpass Tokyo in a few years (initial sections of the line 15 will open in 2025).
1 - https://data.iledefrance-mobilites.fr/pages/home/
2 - https://fr.statista.com/themes/5703/la-mobilite-en-ile-de-fr...
Taking that into account, as far as number of rail lines are concerned, Paris would probably need to at least quintuple its rail lines before it gets even close.
[1] https://en.wikipedia.org/wiki/Tokyo_subway [2] https://en.wikipedia.org/wiki/Transport_in_Greater_Tokyo#Rai...
Length of track will similarly be skewed towards the city with the overlapping competing lines.
Passenger kilometres travelled, number of trips, etc are more relevant.
https://soranews24.com/2024/07/03/man-passes-away-on-tokyo-t...
Hannō > Kotake-Mukaihara: Seibu Ikebukuro Line
Kotake-Mukaihara > Shibuya: Tokyo Metro Fukutoshin Line
Shibuya > Yokohama: Tokyu Toyoko Line
Yokohama > Motomachi-Chūkagai: Minatomirai Line
Those are all different companies operating on the same rights of way seamlessly! When you reach the through service stops, it just looks like any normal stop - there is generally no interruption in service, it just stops for some seconds and proceeds onwards like nothing happened. If you visit Tokyo you would notice that sometimes you'll see Tokyo Metro-branded trains on JR tracks, or Toei-branded trains on Keio tracks, and so on.
Many lines are like this; if you look up any of the central railway lines in Tokyo on Wikipedia, you'll see on their station charts notes about their through services. Some more instances:
Odakyu Line > Tokyo Metro Chiyoda Line > JR Joban line
Keio Line > Keio New Line > Toei Shinjuku Line
Tokyo Metro Hibiya Line > Tobu Skytree Line > Tobu Nikko Line
JR Chuo Sobu Line > Tokyo Metro Tozai Line > Tōyō Rapid Railway Line, and so on.
The Sprinter is the one that stops at every small station along the way, whereas the InterCity is the one that speedily goes only to the major stations.
This has always annoyed me to an unreasonable degree
And that's not how the Parisian RER works - they have very few stops in the city of Paris itself, to prioritise long distance travel and make it faster (somewhat as a reaction to how unsuited the Paris metro, which has a ridiculously dense stop network, is for long distances).
I think it's interesting how the most recent line (n° 14) has way less stops, instead focusing on covering more distance
Funnily this was so successful this led to overcrowding on the 14, hence the extension of the line E to take some of the traffic from the 1, A and 14; and the 14 itself was extended to connect one of the airports and a bunch of suburbs under heavy redevelopment.
Amersham is a 13th century market town. It's not tiny, but it's certainly not a city.
Now, there are mainline services running on the same physical rails which do move passengers between London and other cities, but those don't turn into a stopping underground service, the trains leave those shared rails inside London and run to a terminus station, Marylebone. Marylebone is an Underground station, but only in the same sense as say King's Cross or Waterloo - the Underground is separate though located in the same warren of buildings and tunnels.
The Elizabeth Line is closer to the model explained here, running a fast long distance service, a metro service and then back to fast long distance. Reading isn't a city but it's more significant than Amersham and those are core London services not a terminus with the option to change.
If you wanted to go from Reading to somewhere in central London, it would be faster to take a non-stop express which terminates at the edge of central London and then change onto the Elizabeth line than to take it all the way. The service to Reading is more about providing a local service between Reading and its surrounding small towns.
[1] except Iver
It only has 5 stops with generous distance between them in London/Zone 1, which is equivalent to Parisian RERs. Not really what I would call metro service.
It's interesting because both are true: outside of central london is a metro service, in central london is a fast service. The parent op explains it pretty well in the last paragraph:
> running a fast long distance service, a metro service and then back to fast long distance.
I mean it covers all the stops there are in the city, of which with single line in small city there aren't that many. And then goes to neighboring France, and on the way back picks up french commuters coming daily for (much better paid) work.
There are no dedicated subway trains per se that I am aware of, just this. Helps me a lot to get close to my workplace, although drawback of this is long stops, I guess due to being proper big double decker swiss train and overall a massive behemoth.
I've taken the RER A everyday for few years (both and after automation), and that frequency combined with its size still puts me in awe.
My usual connection with RER A, I arrive at the middle of the train platform, and my next connection is at the end of the train. Statistically I reach the end of the platform before the train arrives maybe 5% of the time?
The frequency is so high that it takes more time to get at the right place of the train than to wait.
It's almost at the level of "don't think of the train, just your walking route".
(I'm saying almost because incidents still happen, and RER A can still suffer of "trains are running slowly because they are overcrowded because trains are running slowly" negative feedback loops, though it's usually resolved within 15m)
On the central trunk frequency in rush hour is a departure every 90s, which means there's almost constantly a train at the station.
It's like a magic trick!
Every other line has dedicated tracks. There can and often are branches, but usually they're 2-3 at most per "side" of the central trunk, with the exception of the unwieldly spaghetti that used to be the RER C between the simplification of it, which reduced it to three branches per side as well.
* RER A in question has two branches to the east, and three to the west.
* B has 2.5 to the south and 2 to the north
* D has 2-3 to the south and one to the north
* E has two to the east, and for now one to the west (I think there will be 1.5 in the end when it's all finished)
So not at all comparable to the S-Bahns that more often than not get all forced into a single tunnel resulting in atrocious frequency on the branches. As an example, frenquency on the branches in rush hour on the A is 5 minutes at most on the least frequented branches. At the worst of times, late at night on the least frequented branches of the least frequented lines you're looking into 20-30 minutes frequency, which isn't great, but isn't terrible either for a station in the middle of nowhere far away on the C, D or E.
I suppose I should say at this point that I live in the USA. And not only in the USA, but in New Mexico :)
> late at night on the least frequented branches of the least frequented lines you're looking into 20-30 minutes frequency
Ditto. This doesn't sound that different from what I remember growing up on the Central Line coming in from the NE of London. Doesn't sound that bad, though more is generally better, I suppose.
Here's an example... from 12 years ago: https://www.youtube.com/watch?v=oCj0yQacKVE
Nowadays these older trains have been deprecated and only double-deckers run the line.
Paris has such a good public transport system, and now also cycling infrastructure, that something like 50% of young adults (<30y) don't even have a driving license !
https://en.wikipedia.org/wiki/List_of_high-speed_railway_lin...
As an engineering project Crossrail became famous for being repeatedly delayed (eventually opening four years late) and many billions over budget.
Since opening the Elizabeth Line has been beset by high numbers of service cancellations and poor punctuality (usually blamed on having to share track outside the central tunnel section with other operators).
Once it opened and started running, I haven't heard anyone complain about the budget overruns or delayed opening date.
According to the ORR's (Office of Road and Rail) first annual report after opening the central section of the Elizabeth line, passenger numbers have exceeded their "post-pandemic optimistic scenario" and the line is on course to be revenue-positive within a few years.
More details in this London Reconnections post here: https://www.londonreconnections.com/2023/the-state-of-rail-b...
https://www.metrolinx.com/en/projects-and-programs/go-expans...
Fare integration is another important piece— being able to jump on the GO to get out to a far-flung subway station like Main or Dundas West and continue your trip from there is a really nice prospect, but having pay separately for it kind of kills the vibe.
> An Elizabeth Line train at the Shenfield station west of London.
Shenfield is east of London!
The core area of West Oakland, SF, and Daly City has service from all lines, so it's the sum of tph of all lines.
Of course, that does not help you at all for commuting outside the core area - which is where the length comes into play. The GP wasn't wrong, just disingenuous.
If you take that approach, then BART looks like a toy compared to its equivalent in London.
By that definition there's about 300 trains per hour in the core of London across each underground line, elizabeth and thameslink. That's in each direction.
That's one train departing from the core of London every 6 seconds, before you even consider surface rail.
BART is like a tree. The branches join together into one trunk. It's shared tracks into the same stations. So measuring the frequency of all the lines makes sense, as long as you only want to move between stations on the trunk.
London is not like that (if I understand correctly). Elizabeth and Thameslink don't share tracks between common stations.
So London has much higher aggregate than BART. But the statement about BART's train frequency on the trunk is not a nonsense statement.
And I agree that for the purpose of a trip within this core, you'd only care about that 5 minute wait, which is pretty reasonable, much as often passengers won't care if this is a District Line train or a Circle, since the stop they're going to is served by both.
In reality there's not much difference between the Hammersmith/City, Circle, and District lines, especially the wimbleware part of the district line.
So all the lines share track from Daly City to West Oakland, with some extending to Millbrae, and then branches on the east side of the bay?
From the map, it looks similar to the Picadilly Line, or Central line, or as mentioned upthread the Metropolitan line, but BART has 12tph on the core, where those services have twice that. Each "line" is just a branch on a core service.
The longest run is 53 miles (there's a completely separate service), which is a bit more than the Picadilly line (46) but not massively, and the frequency is under half that of the Picadilly. I think it's fair to compare BART with a single London Underground line (like the Picadilly, or the Central), just with half the frequency.
The Lizzie line is just one line in London. The closest comparable line on the BART system is the yellow line.
The Yellow line seems to operate a maximum of 5 trains/hour, over a distance of 62 miles, at a max speed of 70mph, and still uses a fixed block system.
The Lizzie line in comparison operates 24 trains/hour in its central core, has a total distance of 73miles, a max speed of 90mph, and operates an almost fully automated moving block system in its central core (that how it can achieve 24tph).
The two systems aren’t even in the same league when it comes to capacity, speed or capability.