- 1.44 gigajoules (0.4MWh) is required for 1 ton of steel. In theory.
- 300T of steel needs 132 MWh, and a "power-on time" (the time that steel is being melted with an arc) of approximately 37 minutes.
---- wikipedia end -----
From https://ourworldindata.org/grapher/electricity-prod-source-s...: total world electricity from renewable was 10,700TWh in 2021. 11,600 TWh in 2023.
1.5 billions (metric) tons of crude steel were produced in 2023. 30% of it by electric power.
------------------------
(A) Let's assume that 20% of those 30% already come from renewable (which is not the case, anyway). 30x20% is 6%. It means 24% of the 1.5 billions tons are looking for renewable.
It means 360 millions of tons needs its green energy.
It means we need to find 360 millions x 0.4MWh = 144 TWh.
If we don't assume (A), we get 152 TWh.
It means we need to dedicate ~1.5% of renewable worldwide energy to replace 24% of crude steel "e-production". In theory...
We observed +5% of renewable energy production worldwide. If we wanted to make the steel *production* go green (1.5*3.33 = 5%), in theory it could be possible in one year...in theory.
Tbh, I expected a more crazy conclusion. I'm quite sure the number is off by more than 10% though. But even if it was off by 100%, it would mean it's possible in 2 years.
On a side note: it's useless anyway if those 5% are not coming with a decrease of 5% of coil&gas consumption. Which is not what's happening...
Feel free to redo the math, I can make a mistake!