TSMC says Arizona fab is now ahead of schedule
datacenterdynamics.com
datacenterdynamics.com
I’ve also heard that the electrical unions will only work 9-5, M-F, and demand a 3 day lead time. Intel has just learned to incorporate that into their planning, while TSMC attempted to bypass the union. Expect TSMC is either adapting, or the AZ politicians have interceded with the unions.
Intel also has a special deal with Chandler to get SRP water. Both Chandler and SRP as a whole probably couldn't afford the same for TSMC. They currently have a complicated deal with Phoenix to take that water from CAP, Groundwater, and the non-SRP allocation Phoenix gets. The difference is supposed to be made up with reclamation.
“Things are going mostly to plan” isn’t very interesting.
Except, they could. Reshoring manufacturing was already accelerating before the Chips Act etc with some seasonal back and forth. [1] The increase in labor costs in China and the pandemic have been US Administration independent in causing reshoring, the US shale oil revolution making electricity and many manufacturing inputs globally competitive in price was influenced by successive Administrations including Trump, but the trade war with China motivated a chunk of reshoring and that still animates policy today and that was started by Trump.
The factory investment charts speak for themselves.
Except it doesn't. Factory building isn't the only metric for progress of reshoring manufacturing and graphs do not interpret themselves. In that chart the overall trend of factory building investment remains elevated through the Trump administration over the previous administration even though the fervor of the shale revolution and the subsequent reshoring was cooling off. Why? The factors that I previously mentioned.