I work in cyber security and use many of the concepts often. The root cause of many poor outcomes are poor assumptions, prioritizing ideology over customer value, and misaligned shared mental models.
I use a simple doc format to address. It's based on evaporating clouds.
1. What's the shared (understanding of current state with a focus on objectivity? 2. What are the problems with current state? Subjectivity is OK here. 3. What's desired state? 4. What are the experiments we can run ASAP to learn if our understanding of desired state is correct and learn how we can get closer.
Simple concept. Works great.
One of the aspects of Queueing theory is responsiveness, and a system with a saturated queue has none. I see this play out over and over again in both machine and human capacity planning. Even with Agile we can’t get stuff done in a satisfactory time frame because we always have a backlog sized for a team twice the size of the one we have, when responsiveness is maximized when the system is running at 50% of maximum throughput.
One of my mentors was really into Goldratt and Ohno, but The Goal got stuck in my tsundoku pile for years. I’m a third of the way through it now (I’m using audiobooks to get through books I “should” read but never do), and it is starting to turn into thinly veiled queueing theory, but from what my mentor said he refers to it instead through the metaphor of drum-buffer-rope. But there’s a lot more to this field, and as I said before, you can apply it to our applications directly, not just to the building of them.
Agile falls down when people misapply it, same as anything else. It's not just the size of the backlog; it's being able to limit work in progress so that you have the ability to adjust. What's more, management needs to get on board with the idea of probabilistic forecasting that's continually revisited, as opposed to trying to stuff complex work into Gantt charts and deadlines. Sadly, most of modern management refuses to make these changes, and too many folks in the trenches don't want to take ownership of their work and just want to be told what to do.
From the manager's pov, though, that just sounds like guesswork. "When will my house be built?" "Eh, not sure, but theres a 60% chance the framing will be up by July".
Development managers need to learn to communicate on the same wavelength as their customers, and vice versa. It rarely happens.
I think that’s why rich people often make terrible customers. They are just as grouchy at plumbers and general contractors as they are at us.
Which reminds me, one of my life goals is to get a full rundown of GC tricks to apply to software development. I’m running out of time for that to make a quality of life difference.
Software is not like that. Codebases are too big, especially counting third-party dependencies. Tech debt is lurking everywhere. Customers don't know what they want until they see it. So yes, in enterprise-sized software, you need probabilistic forecasting precisely because you're NOT building a building. It's impossible to know things in enough detail up front to make big up-front plans that don't largely change like you could if you were building a house.
Architects drawings are little more than nicely descriptive hopes and sketches of an intended idea, which a good contractor has to turn into an actual plan of work.
You want to see chaos go talk to the person running the development of a high end property in New York.
As I mentioned up thread, I want to buy a GC beers and get them to tell me more, before I ever take another contracting gig.
When's the last time you saw a construction project that landed on time? Construction projects are a classic example of forecasting difficulty. Lots of things have to go smoothly at the right time, including supply chain, coordinating work from multiple organizations (including local governments), and the weather has to play nice.
(I ended up using Guesstimate for it - https://www.getguesstimate.com/ - pushing it to the limit of nearly hanging my browser.)
Problem is, most people seem to be overwhelmed by those ideas. It's not hard, but then again multiplication isn't hard either, and most people are afraid of that too. This is a problem because software tends to target the lowest common denominator, which is how we get a million Trello clones, but no tools that understand that work breaks into DAGs, not 2-level-deep trees, or that Gantt charts are good to have, or that probabilistic Gantt charts would be even better.
Great companies are few and far between. Everyone else thrives on self deception.
If you have a backlog, and you don't mark what is dependent on what (in progress or also in the backlog) you're just hurting yourself. Once you add that information and some very basic estimation (even just scale of expected effort is enough) you can generate a Gantt chart and use Monte Carlo simulations to get an understanding of your time estimates.
Some techniques are good but ruined utterly by the company they keep.
I've been fortunate to steer my company towards simply prioritizing work and communicating the prioritization to the rest of the company and more importantly, our customers. We don't give time estimates or timelines to customers, but provide constant updates on where something is. No one has complained about this in general. Of course, there are always exceptions - we resist them all we can, and that too is reflected as reprioritization of backlog.
> No one treats them as estimates but as actual calendar times.
its true, though i suspect this is partially because its what the management chain wants: a date to report when it will be done (e.g will my okr for this quarter be met or not?) > estimates are the root cause of quality problems and expectation mismatches
i have seen this over and over, most quality issues and incidents are caused by decent programmers rushing to meet the immovable deploy/release window... because 'your not gonna make your estimate'....Not just OKRs directly; a software project is usually itself just a node in a larger dependency graph. For example, the company wants the release to coincide with an industry event at some time T, which means that the project must be done by time T, and also must be mostly done (in some well-defined way) at time T-6 months, so the marketing people can be brought in to do their marketing things in time for the event. In many cases (video games come to mind), if there's not a reasonable certainty the project can hit those goals, the company may be better off scrapping it altogether, rather than wasting millions on development, and millions on marketing, only to miss the target entirely.
In general, management wants dates, because most activities that aren't software projects are coordinated through calendar dates, and software projects don't exist in isolation.
> In general, management wants dates, because most activities that aren't software projects are coordinated through calendar dates, and software projects don't exist in isolation.
very true, though i wonder how agile (small a) fits in to all of this, can an organization that is working iteratively on all fronts (including management) avoid (or at least reduce) these dependencies?And do you blame them?
I’m not going to enthusiastically absorb the consequences of bad decisions I already tried to route us around.
Interestingly enough this is something I see in management books and operations research books going back to the 70s. It's a lesson that hasn't been learned.
As for the ownership - I think that makes a lot of sense. People in the trenches know very well that they don't really own the thing, but are just at best responsible for it. I think that is perfectly fine, and the whole "ownership" language tends to obscure very real power dynamics.
One key issue the protagonist has to overcome is how to address the issue of an endless backlog.
While it certainly is true, the side-effect is at the same time the oldest items in the backlog deprecate with time.
(This isn't unique to Agile - any bug database could do this, though they don't typically stack-rank things.)
Putting high-priority tasks first increases responsiveness for them, but will starve lower-priority tasks. That's inherent, but at least management gets to prioritize.
That's only slightly true, and it's a dangerous assertion from a process standpoint to say it is so. Everything is queues. Work in progress, undeployed code, dark features, sales pipelines.
There is a queue of requirements we have defined but haven't acted upon. That's contained within the backlog, along with bug reports and wishful thinking. The backlog is approximately a superset of incoming feature request queue (modulo anything that skips the backlog and goes straight into WIP)
Defining "responsiveness" in terms of everything that anyone has ever wished for seems like a bad thing, though. We can have a brainstorming session that comes up with a long list of features that would be nice to have, end up throwing them out, and that's perfectly fine.
Let's get to the bottom of this in an illuminating and polite way, without further insults.
You made two statements about responsivity:
1. If your queue is 100% saturated you have 0 responsivity.
2. It's common to see maximum responsivity if the team is only pushing 50% of their maximum throughput.
I'm assuming that you are either
1. defining a responsivity metric for backlog items and using it consistently in both cases
2. Using responsivity in the imprecise business consultant sense of the word which is being criticized
Case 1: You're a serious Queue theorist
If you're doing it in the first sense then could you please give us a more technical explanation of which responsivity metric you're talking about and how these relationships attain?
Some questions there:
1) I can't find a responsivity metric in basic queueing theory. I find average occupancy, thoughtput, waiting time, service time, etc - all metrics which describe /aspects of/ responsivity. Can you point us to more specific and holistic responsivity metrics you have in mind? What makes it the "right" metric to capture something as abstract as responsivity?
2) How can a saturated queue have no responsivity? It seems that saturated queue - which I define as a full queue that is still serving requests - still responds in the average waiting time, plus now there's a chance that the request is rejected by a full queue. Assuming the queue is still serving, there should be some nonzero probability that a request will be served, because a position in line opens up, for a brief period, every time a request is completed. So responsivity can't be strictly zero, can it? It would make sense to me here if our responsivity metric drops so close to zero, compared to normal functioning, as to not make any effective difference. For example, if 95% of our requests are being rejected, and all accepted requests have awful waiting times, then it makes sense that responsivity should be considered effectively nil.
3) where can I learn about the model where maximum responsivity requires some sacrifice on throughput? Usually for this kind of result we have some curve, we take it's derivative, and it turns out the critical point is some equilibrium or maximum. Do we really have the ability to do this for coding teams and their backlogs? That could give us serious objective power in negotiating our work throughput! But it requires a trustworthy model.
Case 2: Your a business consultant and you're laying it on a little too thick
Finally, if you're doing it in the second sense, then you are using the term in the sense that is being criticized. In particular, using it without a formal definition, in a way such that a business audience would hear "responsivity" as whatever metrics they care about most. That would mean you use queuing theory terminology to misinform and manipulate those unfamiliar with queuing theory - probably the most used application of queuing theory in the industry. If you're intentionally doing this, and willing to insult people who call you out for it, we probably couldn't persuade you to own up to it or stop. But if you're not aware of it, you might reconsider how you use queuing theory terms, and commit to being accurate and objective. I state this not only for your benefit but for my own benefit, and for the benefit of anyone who might use technical terms imprecisely! It's always best to be able to ground technical statements in objective theory.
Conclusion
Assuming that you are using the term accurately, with a particular metric in mind, I'd love to learn about it and analyze the metric in our two pet cases. If you're being shady, I hope you'll recant and improve the accuracy and honesty of your language. Thanks for your patience and dialogue!
Wait till you realize optimizing data flow through an API process serving multiple requests is the same meta problem as optimizing value flow through a development team. :)
For a period in my life I was very taken by the promise of a node-based graph visualisation of projects, enabling you to quickly track dependencies, constraints, next steps, redundancies and so on.
ericalexander0's comment above touches on some of it ("poor assumptions, prioritizing ideology over customer value, and misaligned shared mental models")
In my particular case, I was expanding a business and starting a new one and had just discovered the whole "productivity" scene and had naive notions of using task management tools and Notion wikis to achieve some latent superpowers. But I got into a rabbit hole where nothing was good enough, there was always some element of lossiness as you moved between tools, and all the tools in the world are not a subsititute for having clear mental models and actually just getting on with the job rather than thinking endlessly about the most beautiful and intuitive ways of getting it done.
Separately from these meta-concerns, building and navigating a model was not as fluent as a Workflowy/Dynalist situation (the latency was small but annoying - like early days of Notion), and as your model built up and reorganised it was easy to lose track of things. There's still some value in graph-based knowledge management (e.g. Obisidian), but it's also important to remember that storing and having access to information (however aesthetically pleasing it might be) is not the same as knowing something.
Possibly a larger conversation lurking somewhere about productivity, management, the meaning of work, ADHD, and friction.
Node based is fascinating though, I’d love to see what that would look like.
Also for recipes!
And for argument graphs. Premises, therefores/lemmas, conclusions.
I don't get heavily into CRT/FRT, at least not the most disciplined versions. I find that in practice the kinds of problems that justify that in-depth level of analysis are few and far between.
Do you share or collaborate on these models with anyone? I find that it's very easy to assume that people will look at the model and see what you're seeing but mostly their eyes glaze over.
Also: recipes? Just what are you cooking up?
I often screenshare. You can also share the *.xlogic files, even via git, although the company has made it harder to download a free version of the app that can read them read-only. Last I checked it seemed they require a credit card even if you don't buy.
The natural representation of a recipe is a DAG! ;-)
Here's a practical example. For those who may still wrangle fleets of actual cloud instances (instead of going the managed cluster or serverless route), a common mistake is to imagine that all that is needed is a group of the smallest compute units available. But with AWS, for example, this can bite you when the smallest instances also have dinky allowances for network and/or disk I/O compared to medium or larger instances. People end up wondering why their queues aren't draining quickly or their DB writes or log pipelines are backing up, etc.
In my latest job this was exactly the case. We were modernising a good old big ball of mud. And we made very decent progress on a part that was supposed to read from an API. That was nice but turned out that the API itself is poorly designed, and the vast majority of problems and slowdowns are coming from the other side. And the true bottleneck was that the team responsible for data was not very well prepared, so there was little design, poor coding, etc. And what really turned out to be the bottleneck is that the entire department just has a problem with processes and with hiring and retaining qualified people, and with ups killing the existing ones ...
E.g.
- optimizing parts of the system for their own metrics often leads to degradation of the whole system performance; any optimization must be done w.r.t. the context of the system as a whole
- focus on optimizing the bottlenecks
- approach to identifying bottleneck
- minimize amount of stuff waiting in the queues
I love this book. It laid out in an approachable way my observations w.r.t how humans fail to organize efficiently by just not being good at thinking in terms of a larger system.
I use the concepts from this book all the time at work to justify a prioritized backlog and defend against a lot of work in process.
When we first meet the exec he’s poking the hornet’s nest to get a rush order done, and he pisses off a machine tech who quits in a huff, accidentally breaking the one machine they need the most in the process.
Which is way too close to home for some of us. The guy bitching the loudest about the problems is usually the source of at least a third of your problems.
Be aware however if trying to apply in real life that most managers will fight you since it seems counter-intuitive.
I'm actually curious if any business use Operations Research for real, vs. managers just guessing. I mean do something like Linear Programming to optimize profits based on various constraints.
I personally think that there is a LOT of very useful stuff in the field.
The MIT LGO program has some theses published online that show how OR techniques are applied at smaller scale in industry.
I’ve been involved in some smaller scale projects that used mathematical programming techniques to help with scheduling manufacturing lines and call center shifts. We’ve used simulation to help understand how improvements can be made in call centers and warehouses.
Lots of this stuff is under industrial engineering at the operational level.
At the supply chain level, often a company is using the services of someone else. Sometimes they’ll have industrial engineers working with these techniques.
[1] https://www.informs.org/Recognizing-Excellence/INFORMS-Prize...