This really is the "lowest hanging fruit" of the construction industry.
This really is the "lowest hanging fruit" of the construction industry.
Did the tolerances truly need to be so tight? Probably not, and just set so by a designer somewhere. But the panels do have to line up for tying into conduit that goes to (pad mounted) transformers and distribution equipment, etc.
What I meant was, for something like a building, the plan will describe the invariants of the design, but what it really reveals are all the available variants in achieving that outcome on the actual site. With a solar farm that available variance is actually very small because the overall "plant" has very little additional or emergent structure.
This is somewhat like AVX - it only works if you have large enough vectors (a simple operation that is repeated a million times on contiguous data). Arbitrary buildings are much harder to optimize.