https://www.youtube.com/watch?v=_IxqdAgNJck
I don't blame him at all, it's a safety thing and the M&Ms are one way to see if everything is being done properly
Van Halen got away with it because it's Van Halen.
It doesn't work for the musician hired just to have someone playing.
As a mid-career software person, one of the most important things I've recognized is that my trust for my colleagues hinges on them knowing their limits and knowing when and how to escalate hard problems. I don't want to hear about small problems— those they can solve themselves. But they need to know which problems should become a quick slack message, a whiteboard chat, a revisiting of the design doc, or even questioning the fundamentals of the whole project. A person who slaps on duct tape when they should have engaged a war room discussion is someone who ends up needing almost constant supervision.
Oh man, I'm saving this because this has been my experience working with folks on the business side who seem to always optimize for the second group (the deluded gives a low quote, then the project drags on forever, spiraling out of control because they didn't think through the difficulty).
1) Reject it outright as impossible. (shows unwillingness to consider difficult projects or refusal to let the buyer make the call about what is too much)
2) Assure the buyer you can handle it with no specifics. (shows willingness to overpromise)
3) Give a too-low estimate. (Shows technical incompetence and overoptimism.)
>>If your price had been too high, we would have eliminated you, too. But that’s a different test.