BART to offer final rides on original equipment on April 20
trains.com
trains.com
45-65 miles range, and 20-30 minutes to charge 20->80%. Better than I would have expected, and certainly could work well on shorter routes where full electrification is impractical. Sounds like it will be built in the US as well.
> Buff strength is a design term used in the certification of rail rolling stock. It refers to the required resistance to deformation or permanent damage due to loads applied at the car's ends, such as in a collision. Particular emphasis on buff strength is placed in the United States, with buff strength requirements there being higher than in Europe.
Never heard of it before either.
Really the worst-case scenario for a train crash is a collision on the side, because carriages are not built for it. This is the main reason why the Eschede train disaster [0] killed 101 people - the train "folded" because part of a broken wheel had flipped a railroad switch underneath the moving train. Then the folded carriages crashed sideways into a bridge.
https://dims.apnews.com/dims4/default/0fe6b8a/2147483647/str...
No, our trains are just waaay shorter - around 740-835 meters and a maximum weight of 2.200 tons [1].
US trains however? 3.6 km regular length limit [2], with the record being held by a 6.5km long and 48.100 tons weight. Even just at shunting, the forces in play are so much larger than here in Europe.
[1] https://die-gueterbahnen.com/news/zahl-des-tages/4.html
[2] https://www.uirr.com/en/news/mediacentre/2286-the-optimal-le...
[3] https://zmodal.com/2020/04/30/trains-are-longer-and-heavier-...
I’m a little sad those are going away.
That’s a bigger problem than seating arrangement I guess.
(Tweet about bedbugs on the yamanote line)
I'm guessing it would be massively expensive, and it's not clear to what end they would change it.
It's not like they could then buy cheaper off-the-shelf trains, since the trains still have to be designed and built for the particular system in other ways, i.e. controls, propulsion, and custom interiors.
Also, BART doesn't share tracks with any other system, so there's no reason to do it for compatiblity's sake either.
It's not like they could then buy cheaper off-the-shelf trains, since
the trains still have to be designed and built for the particular system
in other ways, i.e. controls, propulsion, and custom interiors.
They could but they've doubled down on American exceptionalism (or NIH if you prefer). For instance, Muni's Siemens trains (and the Boeing/Vertols and PCCs before them) are far closer to a standard train than BART's stuff. The real advantage is in cheaper propulsion and maintenance kit. BART runs a non-standard voltage and had a ton of trouble sourcing thyristors for their old fleet. Track maintenance vehicles also need to be custom built. BART doesn't share tracks with any other system, so there's no reason to
do it for compatiblity's sake either.
BART doesn't share tracks because they can't. As a result they run three separate fleets of wholly incompatible vehicles for no good reason. eBART is a standard gauge diesel multiple unit system – because even with BART's typically inflated ridership estimates they couldn't make the expensive mainline kit work. That would've been a perfect opportunity to start the excruciatingly slow process of converting the mainline to more current standards.If Bart hadn't picked a goofy gauge, it would probably be using the Caltrain corridor by now.
I haven't been following the whole electrification effort (except seeing it happen): will S&P still run diesel freight on those tracks?
Here are some videos from when SP ran the “Peninsula Commute” <https://en.wikipedia.org/wiki/Peninsula_Commute> service before the formation of Caltrain:
— Fairbanks-Morse Train Masters on the SP Peninsula Commute in 1972 https://www.youtube.com/watch?v=XElWHtywY6I
— SP Peninsula Commute (February 26, 1985) https://www.youtube.com/watch?v=TqORVlDs4lQ
— 1970s Southern Pacific Commuter Parade https://www.youtube.com/watch?v=O_-BgistV-w
Before 1975 it ran to the old 3rd & Townsend depot instead of 4th & King like today: https://en.wikipedia.org/wiki/Third_and_Townsend_Depot
(I used to live not far from a crossing in Palo Alto and they had to toot their horn as they went past at 2 am but I can hardly call it burdensome)
I have seen rail deliveries during the day in Redwood city to the port but I don't think that spur connects to that line...? It is shocking that the rail runs right down residential streets with NO separation to keep kids from being run over.
I believe freight typically has RoW priority over passenger fleets
That's a big part of it.The other part is that UP is making electrification difficult and more expensive. UP wants to run double stack cars but the overhead wire would eat into the vertical clearance. I believe there were issues raised with horizontal clearance too.
One major benefit vs a shared authority is if someone wants to pay less into it and someone else wants to pay more, it is hard to get the two sides to work well.
Look at New York MTA where the LIRR and Metro-North have had the same owner as the subway since 1968 and yet there is no combined way to pay or integrated fare.
I say cacophony because there are bus', cable cars, vintage light rail, modern light rail, subway, tram, local neighborhood shuttles, and I'm sure I'm missing a few.
[1] https://en.wikipedia.org/wiki/Montreal_Metro#Station_design
Don't get me wrong, I think BART should have just gone with standard gauge. However the gauge isn't goofy and is not a source of big problems.
- The standard BART fleet
- eBART: https://en.m.wikipedia.org/wiki/EBART
- The Oakland Connector: https://en.m.wikipedia.org/wiki/Oakland_Airport_Connector
All of which use completely different and mutually incompatible rolling stock.
Aren't Caltrain's new electric trains essentially off-the-shelf? A few years ago when they needed more capacity, they bought more bi-level Bombardier cars from another agency. They went into service without being repainted.
Fixing the gauge mistake will probably never pay for itself (NYC can't even settle on a car width), but it'll be a never-ending headache and tax for the agency.
The (arguably) good: 1) they have a boxier profile than the standard KISS, which some have complained about, but the reason the European version is less boxy is because Europe has a more restrictive loading gauge (the allowable cross-section of the vehicle), resulting in a more cramped upper level. Caltrain doesn’t have this issue, and so the upper level will not be cramped. 2) The Caltrain KISS is more powerful than the standard, which would allow for a faster top speed… if the corridor was upgraded to make use of it, which it is not. Maybe someday.
The bad/silly: two sets of doors… a higher set since HSR might allegedly someday come to this corridor and require changing the platform height, and a lower set because that ain’t happening for a long time, if ever. I think there are some other bad/silly things which I’ve willfully forgotten about (I think they fucked up the ADA lifts somehow?), which I’m sure are documented somewhere on Clem Tillier’s excellent blog.[0]
The ugly: “buy America” requirements forced Stadler to build an entire factory in the US, raising the cost by over 50% compared to the standard KISS. This is the bad kind of industrial policy which raises costs without actually building up US industrial capacity in this field (if Stadler closed the plant tomorrow, the US wouldn’t retain any expertise or capacity to build trains).
This is because the oldest tunnels (the numbered lines) are physically narrower than the other two systems (lettered lines), so you can’t run the bigger trains through them. It would be (relatively) easy to run the narrower trains on the wider lines, but would need some retrofitting, and reduce throughput way too much.
Isn't that a chicken/egg issue? How could BART share tracks with systems using incompatible rails?
any cost savings are gone.
Until you want to expand to low (by BART's low standards) ridership areas like Contra Costa. Or once the area transit agencies are consolidated and then tasked with expanding e.g. SMART.Yeah it would've been best to standardize 30-40 years ago. There are still tangible benefits today especially as expanding rail service in the Bay Area becomes more popular. Besides, BART is struggling mightily with their proprietary power kit (e.g. mystery power spikes along the orange line).
"wind stability" is the given reason:
https://www.bart.gov/news/articles/2022/news20220708-2
and it is a standard gauge, "Indian gauge", just not the standard gauge. which keeps it free from freight trains and other mixed traffic, which helps with punctuality.
also if they wanted to change that they could introduce a dual gauge track, like the Stuttgart area did for their mixed tram/underground
https://en.wikipedia.org/wiki/Stuttgart_Stadtbahn#/media/Fil...
BART’s planning is basically a comedy of errors by aerospace engineers who specifically did not want to learn anything from other rail systems, hence the nonstandard car layout, the nonstandard electrification, the nonstandard wheels that make too much noise, etc. BART themselves clearly do not believe much of it anymore given that they operate a standard gauge line.
Really stood out in the trip from the airport it was significantly louder than my flight. I was worried I was losing my mind, thanks for confirming that it’s real.
On p. 2, it explains that the BART cars were specifically designed to be lighter weight than normal rail cars in order to minimize the energy required to rapidly accelerate to 80 miles/hour (129 km/hour). The lighter weight makes them less stable in crosswinds.
On p. 13, there's a short cost analysis, and their conclusion is it will save them $2 million overall because it will cost additional money to build but will save even more money on energy.
So it's a different trade-off. They gave up stability to gain energy efficiency. So they then did something to regain the lost stability.
---
[1] https://www.bart.gov/sites/default/files/docs/BART%20Stabili...
what's done instead is recuperation of break energy as electricity.
the concepts looked good on paper but they didn't work out as well in practice.
of course it's not needed because there are more ingenious solutions to the energy consumption problem and crosswind stability.
for example recuperation of break energy. thus you can build slightly heavier trains which withstand side winds despite the slightly narrower standard gauge, which again allows you to buy internationally, further saving costs and further benefiting from energy saving innovation.
bY using an unusual gauge they painted themselves into a corner (another idiom) as they can't easily sell old material on and buy newer BART cars.
Also, it's kind of by luck - BART uses the so-called Indian gauge, and Movia trains have been acquired by Indian cities for their metro systems, so Bombardier/Alstom already had everything in place.
It’s sometimes claimed to be a driver of costlier rolling-stock acquisition, but this is dubious. There are many track gauges around the world, and not a lot of evidence that nonstandard ones cost dramatically different amounts. And even if bespoke gauges did cost more for economies-of-scale reasons, BART’s gauge is hardly unique: it’s the same gauge used in India, and just a couple mm from the one used in Iberia and much of Latin America (in practice they are demonstrably interchangeable). So there is a huge amount of rolling stock being manufactured for this gauge. It doesn’t require reinventing the entire production process or something.
The other claimed benefit to standardizing BART’s gauge that I sometimes hear is interoperability with other systems, but this is very difficult for several larger reasons, and also not necessary or desirable. For one thing, BART also has a nonstandard wheel profile and corresponding rail profile, so you wouldn’t just need to move the rails closer together, you’d actually have to replace them all. Beyond that, mainline rail systems have tougher crash standards than fully-separated metro systems (even after recent reforms), so you couldn’t run BART trains onto mainline tracks unless you bought heavier (and more expensive) rolling stock than what BART and other metro systems normally buy. Another issue is that mainline rail systems use different signaling and electrification (if they even have electrification) systems, which would require either an incredibly expensive overhaul or the use of multi-current/multi-signaling trains, which again increases the cost. Also, mainline rail is generally not grade-separated like BART, which would need to be changed at great expense, or BART would have to accept reduced reliability due to grade-crossing conflicts (this matters less for infrequent regional rail, but is huge for BART which must timetable dozens of trains per peak hour through the Y-junction in Oakland). Stations would also need to be harmonized to the same platform height (BART’s is different from any other system in the area) and length (stations would need to match BART’s extremely long trains).
Interoperability also doesn’t offer much benefit. Usually I hear about this in the context of Caltrain: instead of having these fragmented systems, wouldn’t it be nice if BART served the peninsula? I agree! We can do this by merging the agencies and putting new logos on the trains, without worrying about replacing rails and redoing the electrification that Caltrain is just finishing up with. I’m only slightly oversimplifying. We should continue iteratively upgrading Caltrain into true rapid transit with things like BART-style level boarding, all-day high frequencies and regular intervals, and grade separation. And we should extend what is currently known as Caltrain downtown and then across to the East Bay[0], providing good transfer opportunities with current BART. If this is done well, it should all feel like one regional rapid-transit system to the rider[1], much like New York subway and Berlin U-bahn riders usually don't even realize that they’re actually using multiple incompatible systems. At the end of the day, good integration and high service quality are what matter to the rider, not the underlying technology.
I think eBART contributed a lot to the idea that BART’s gauge is a big problem, since this weird DMU thing was sold under the premise that “normal BART” was too expensive. Really the things that were (allegedly) too expensive for this low-ridership exurban tail were electrification and the huge stations necessitated by BART’s extremely long trains. Those factors would've still been there even if the rails matched up.
So was it pointless and dumb for BART to use a nonstandard track gauge? Yeah. It was part of the marketing for a “space age” system that wanted to be seen as different from ye olde train. But is it really a huge problem that’s worth correcting? Nah. It’s only worth changing part of it if you wanted to convert a segment of track from mainline to BART or vice versa—and the cost of the track stuff would pale in comparison to other factors (electrification, signaling, stations, grade separation).
[0] https://caltrain-hsr.blogspot.com/2021/09/down-tubes-with-dt... [1] https://caltrain-hsr.blogspot.com/2023/03/the-false-choice-o...
That is no longer true. The FRA rules that required heavier rolling stock on mainline rail no longer exists. You will find many people buying trains(and thus should know) who are unaware of this rule change.
You are right about the rest.
The new BART fleet is much nicer than the old fleet in many respects, except for one very big issue: when a few drops of water fall onto the track, they have to slow down all the trains traveling through affected parts of the system. Worst case in my experience, this increases my travel time by 33%, which really adds up on the longer distance rides. My understanding is that in the rain, the new trains are just too good at applying brakes to all the wheels when they detect the wheels slipping on the tracks, and as a result, the wheels grind against the track to create flat spots. The current mitigation is to slow down the train, and it doesn't sound like they've figured out a long term solution yet.[0]
Your point about the system having a "nonstandard wheel profile and corresponding rail profile" stood out to me here. So I'm wondering, just how nonstandard is that? And is this wheel flat problem something exclusive to BART (and, perhaps a result of this nonstandard wheel profile)?
[0] https://www.nbcbayarea.com/investigations/bart-wet-weather-b...
The aim should either be vastly more remote work, residing closer to work, or closer to mass transit between work. The first way is simpler, cheaper, and does away with about half of a transportation needs.
For those who didn't know, bart used to have:
- Generously padded cloth seats
- Carpet (!!!)
- Free parking
- Magnetic paper tickets, and the turnstile machines would stamp the remaining balance upon exit. They'd also get demagnetized all the time, or get stuck in the machine.
Yes, the cloth seats and carpet were terrible ideas, but before they got all disgusting, they looked and felt nice. Bart used to be really nice, it was clean, and people generally respected the system. I still think BART is fantastic, but I don't deny it has its problems.
Anyway, BART dropped a ton of merch when they were decommissioning their old stock, and I managed to snag an aluminum car ID plate and a real system map! https://imgur.com/a/rCvf93S
Pretty good deal for a delinquent minor with hardly any money.
It's hard to overstate how vile the old wool seats were on BART. It took the NY Times reporting that the wool covers harbored MRSA and other nasties to prompt the switch to vinyl.
Oh dear god, you just brought back the horrors of a Southeast Ireland (Enniscorthy) pub’s carpeted fucking bathroom. You know you’re a pub. You know you’re in Ireland. And yet you chose carpeting laid in 1910 and decided every day thereafter “yeah, looks good.”
I also had a carpeted bathroom in my first apartment. I don't know what the fuck the landlord was thinking.
source: eyewitness
Granted I haven’t traveled much, so I don’t know if it’s globally unique.
interesting - it's completely deafening and unbearable for me personally
Waiting for the first "LLM or municipal transport authority" guessing game to pop up...
(Disclaimer: From Europe, so I didn't know about BART. Not that we don't have ridiculous authority names around here too...)