Having built a 64-turbine windfarm back in the 2000's (so they were likely smaller than they are now) a goodly chunk of the work involved was site prep in building access roads traversable by the cranes required to set everything up, and the massively over-length trailers carrying the blades. Things like maximum grade, radius of the turns, breakover angle etc were hugely important.
Grading out and paving an airstrip when you already have an appreciable contingent of heavy earthworking equipment onsite and, likely, also a concrete batch plant to reduce the travel time for the concrete you're using for the foundations really isn't too big of a stretch!