Why we stopped building cut and cover
worksinprogress.co
worksinprogress.co
1. Two small-bore TBMs ~2 stories underground, one for rail in each direction. This would require cut and cover for the stations only
2. One large-bore TBM ~7 stories underground, with technically enough space to fit an entire station platform inside but displaces a HUGE amount of soil/rock along the entire line, and require very deep stations that take a long time for riders to enter/exit.
VTA consultants went with option 2 because they didn't want to disrupt the surface (again, only for the few blocks where the stations would be built) even though it costs $$ billions more.
Many transit activists (including me) are upset because it makes the project both take much longer and cost more. We could save money by literally just giving billions of dollars to the businesses on the affected blocks. There's no geo-technical reason to go with the large-bore option. This has also led to a lot of recent VTA-negativity among these activists.
Real life example underway now: there's an SFPUC project in SF Mission district to improve stormwater drainage. City proposes TBM but this will result in years of having a huge tunnel entrance work facility in a residential neighborhood. Cut and cover would affect specific blocks but only for months and then move on to the next. Which is better?
PS. To all the OpenAI folks, this project is happening around all your offices!
You’re pissing off one set of residents immensely rather than every resident in the area sequentially. The marginal harm you do to yourself by pissing off residents is diminishing. Better to piss off fewer voters.
This is the kind of thinking that leaves us mired in the past, unfortunately. As soon as these projects are completed everyone loves them and completely forgets about any minor transient misery a couple of restaurants were caused. Compensate them and move on. The billions of dollars saved using cut & cover vs. a TBM sets up a heck of a compensation fund.
There's this real unstated mindset now where nobody should ever be inconvenienced, ever, no matter how mildly. It really holds back urban development. People will get over it.
It’s an optimisation problem of our political system. It’s not that we are not wanting to inconvenience people. It’s that people have rights relating to property and our electoral system is set up geographically so benefits that are non-local are externalised in electoral calculus.
Political systems are complex adaptive systems. They exist to perpetuate themselves. Their decisions will be whatever leads to their short term (read the foreseeable future of the humans involved) survival.
This isn’t an indictment of democracy itself but our system could need to be renovated. It is a little pathologically short circuited.
> It’s that people have rights relating to property and our electoral system is set up geographically so benefits that are non-local are externalised in electoral calculus.
For what it's worth, people don't really have the property rights they think they do. Eminent domain was brought in for exactly this kind of purpose decades and decades ago, and used extensively. We've just decided to stop using it.
I think that's a cool outcome in a coordination problem, where added technology makes neither technology workable.
This article was wicked sick, by the way. Great use of illustrations etc. This is free? Incredible. It's like the old web.
Building up is actually a cheaper solution, we just need to get the NIMBYs under control. Imagine how nice it would be with 101 and 280 being double deckers the whole way.
To be honest, I like 280 without there being something on top of it, but if that's what's necessary to get a rail line down there I'd gladly accept it. Just the per-mile cost. Well, I'm not looking forward to paying more than half of every marginal dollar to the government so it can give it to its cronies who just happen to be husbands of famous California politicians.
In any case, I wouldn’t use the UK as an example of tunneling efficiently. Crossrail, for instance, is on the order of more expensive urban US projects and there’s a fairly consistent recent history of either not building or letting existing rail infrastructure decay.
This link provides a decently contextualized comparison IMO, although it is slightly out of date now: https://pedestrianobservations.com/2011/05/16/us-rail-constr...
The fact that it’s one of the most technical areas in the world and we’re stuck driving between SF and the valley is a disgrace
Why did you choose to live in San Francisco? You cannot expect the transit system to revolve on a dime around your housing & employment choices.
Caltrain's current ridership (very poor) demonstrates the need to change the connecting systems so it is popular again. The idea of having rapid busses connecting to the caltrain stops (especially 22nd and bayshore stations) is hardly a massive thing, and could significantly improve transit across the Bay.
Building robust transit between SF and San Mateo is good for everyone, its not selfishness.
It's got under a million people, and is only the second largest in the Bay Area. It's locally very important, but let's not get carried away here.
You can have various systems of zones or service levels, but there needs to be a maximum cost it is not possible to exceed to make it easy to budget. People who expect to hit that maximum will not hesitate to use transit or send their kids on it and thus are more likely to decide they don't need the car (even though a car probably costs more most people don't account for the costs of a trip)
In the future, I’d love if Bart could build an extension past millbrae, but they have some other more important things to do imo
Older bigger cities have built huge underground infrastructure recently. Londons power tunnels & crossrail for example.
It's absolutely about the lack of data about historical infrastructure. LA's Regional Connector line was delayed for years, and the budget ballooned by over a billion dollars, due to the discovery of thousands of undocumented utility lines (still in use) along the route. This necessitated dramatic changes to the project timeline and scope, since the construction authority had to reroute all of those utility lines.
I've never heard anyone successfully articulate why building enough roads to meet demand is such a bad idea. People need to get around and Caltrans has demonstrated they are far more competent and capable than BART or MUNI.
Freeway construction has changed a lot since the 70s and 80s. We now use ductile concrete that can flex without breaking, do extensive soil analysis for footings, and add seismic isolation systems in high risk areas.
"The highest number of deaths, 42, occurred in Oakland because of the collapse of the Cypress Street Viaduct on the Nimitz Freeway (Interstate 880), where the upper level of a double-deck portion of the freeway collapsed, crushing the cars on the lower level, and causing crashes on the upper level." (https://web.archive.org/web/20090707140922im_/http://home.pa...)
Cheap land, low density, lax environmental regulation?
It was on a green strip of undeveloped land, so I have a small suspicion that a landslide may have been involved. I mean how else do you 'lose' a building?
During the bubble, the Imperial Palace grounds had a higher real estate valuation than all of California.
2027 will be the centennial anniversary of the Ginza Line, and that's a baby compared to Paddington Station, which had its sesquicentennial a decade ago.
Apparently the Tokyo postal service had a private line in 1915. I kinda wonder if that's the one they 'found'.
It is highly disruptive to the entire area so it really depends on where the tunnel is being placed. Appropriate traffic and pedestrian accommodation plans are essential.
A lot of the bad things about construction come down to incumbent players being able to force extremely costly methods on anybody who wants to improve the world. So a lot of the challenge is political. Solving political problems is really hard, but when technology can sidestep the problem, there's a lot that becomes possible.
For those in the Bay Area, we are seeing aversion to cut and cover be a huge hassle for our stations. The depth of some of the new transit stations will be a huge inconvenience for generations of transit users, all to satisfy a short term disruption of a far smaller number of people. This problem could have been solved with money, for those affected, if it were not for the politics.
Stations along bored tunnels sometimes take as much as 5 minutes to go from street to train. One I used to regularly use had three separate multi-story escalators, in addition to long walkways between them.
So even if cut and cover disrupts businesses and car traffic, I can't help but wonder if decades of extra delays to reach the tracks from many thousands of people a day doesn't wind up outweighing that.
> This thesis summarizes and evaluates the performance of Tunnel Boring Machine (TBM) construction in Singapore's MRT network. Surface settlement induced by the tunneling process can cause damage to underground utilities and foundations and buildings and/or disrupt daily life by damaging roads and pavements, and is used in this thesis as a measure of performance.
Partly yes it seems to be a question of stability -- you're not going to bore and leave just a couple of feet of soil above, because of the way you want the arch of the tunnel to support itself, and that's not going to be strong enough. And close to the surface you've got looser soil etc. Going deeper does provide greater stability, in a way that isn't needed for cut-and-cover because that is supported by steel beams, not arches. But this doesn't generally require you to go crazy deep.
The bigger factor behind these crazy-deep tunnels seems to be pre-existing infrastructure. If you're doing cut-and-cover, you're digging out all of the infrastructure first and then replacing it -- it's highly disruptive. While if you're boring a tunnel, you need to go below everything that already exists -- sewers, water lines, deep building foundations, pre-existing subway lines that it crosses underneath, etc.
Makes perfect sense!
And yeah, it's yet another case of path dependence: we'd build far different cities if we had the option of designing "from scratch" rather than layering retrofit over retrofit under retrofit.
In an ideal world, we'd have tunnels connecting B1/B2 of every major building in a city, and many people's trips would be elevator-transit-elevator.
As is often the case, the answer is "follow the money".
I believe it opened and immediately shut again so they could try to deal with the water problem [though responder says no]. I went through when it was briefly open and again after. They made it less bad, but it was still pretty awful.
A club I belonged to met at a library near the station so it was easiest for me to just hop on the light rail after work and then take it back to the bus terminal after but gods did I want to hold my breath the entire time.
Maybe it's just a matter of opinion, but I never found the Beacon Hill light rail station to smell like anything other than raw concrete, similar to DC metro or any other deep tunnel system.
I lived in the neighborhood at the time, and don't remember the station shutting down due to water ingress. Opening was delayed due to issues with overexcavation, but that threat was with sinkholes opening to the public above, not issues with the tunnel itself.
After years of rhinitis my sense of smell is half-shot, but I can still walk into a room and find the forgotten towel moldering away under a chair or table. Why couldn't I have lost that power and kept something more pleasant?
[1]: https://www.youtube.com/watch?v=TEYvywnJy78 (Swedish)
https://en.wikipedia.org/wiki/Édouard-Montpetit_station#REM_...
How are the elevators any more of a problem than in buildings, where they are commonplace, often for much taller structures (i.e., many more floors), and not considered a major expense?
Edit: Thanks, good points about the volume/throughput.
This is why even deep subway stations usually go with multiple levels of escalators to keep the flow of people moving continuously.
https://www.sfgate.com/bayarea/article/Rights-group-sues-BAR...
1. Most delays in tunneling projects are due to elongated decision making processes 2. The majority of the cost of the machines are their initial construction, not operation or maintenance
Solution: fleet of TBMS are set off in arbitrary directions that bounce off the city borders like the screen saver with the bouncing ball. This creates a large network of tunnels all across the city. When it comes time to decide to put new infrastructure in, one of these tunnels is already there somewhere close, just have to dig down to it. 0 decision fatigue/cost, max efficiency for cost per tunnel foot.
Directly paying everyone living/working nearby to get them to accept cut and cover construction? Wouldn’t that cost even more then building it deep underground, after all the legal fees and court challenges, once it’s said and done?
Lot of money to go around, I'd argue its more political will than cost.
Don't forget theres years of legal fees & court challenges even with deep tunneling!
There's no simple reason - basically everything that can cost more, does.
A lot of it is that every last bit of expertise is outsourced.. not just physical labor and renting equipment but even the project planning, management and oversight. You'd think given decades of capital programs lined up, the state would want to have their own planning/management/oversight staff so that interests are more aligned.
You can't pay yet another vendor to care about & enforce cost discipline upon all the other vendors you are paying..
You also can't discount antiquated union work rules & strong lobbying. NYC transit work sites are more heavily overstaffed compared even to the equivalent Paris transit project. "Our unions have more power than in France" is a pretty high bar. From having 3x the staffing on the Tunnel Boring Machine to minimum required union machine oilers on-site based on the level of hand oiling that 1970s equipment needed (far more).
It's like if IT's staffing / roles were frozen in time from the 1970s and we still paid someone to sort punchcards.
So only what, about 30x as much as Madrid spent?
Maybe new boring machines are faster and cheaper and break down less than before.
But the externalities of cut and cover can be very expensive (blocks streets, and hurts nearby businessen even to the point of going out of business). Those second order effects, even if transient on a long term scale, can cause expensive hold ups. Other externalities are the need to get around existing infrastructure, some of which could have over a century of continuous use.
So for example in NY it is almost impossible (look at the 2nd ave subway, which is mostly pretty shallow) while in LA cut and cover was no problem at all.
Businesses should take risks. However government should not add extra risk without careful consideration.
I'm talking about the US here -- no idea elsewhere.
Is it more or less disruptive if you do a checkerboard pattern instead? Instead of n months of construction around your favorite coffee shop, would it be better to have n/2 months of construction now, and n/2 months of construction in July? Maybe that depends on where you are on the street. If, for instance, you start at both ends, then the businesses in the middle of the cut have construction sites boxing them in for almost twice as long as anyone else does. Or maybe that just means more people of means mad at elected officials.
If you could build the entire thing in 2 weeks (per year) people would be happy with a full road closure - they would all take vacation for those two weeks. This is for the entire city - close all roads to non-emergency traffic for two weeks, fix them all up - everyone not involved in road work or essential services would just go on vacation. You cannot do this of course, but that is what people really want.
I recall when South Lake Union got its trolley, one of the things they pointed out was that property values next to a trolley drop, but property values 1 block away go up more. Everyone wants to be a couple blocks from transit, not living above it. So even if you avoided the main road going parallel to it, you're probably tearing up even more desirable real estate and commercial zoning.
When you ignore all the side effects, sure (especially if you also ignore the risks of blowing the timeline).
Trenchless tech is spreading fast even in small-ish (street utility scale) construction.
> Maybe new boring machines are faster and cheaper than they used to be.
I'm not sure that's even the case, AFAIK TBMs are still custom-built for the job, highly geology-dependent, and require a ton of babysitting. If you hit an unexpected patch of really different geology things can get really dicey.
This is semi-true. They are built for the job, but the design is standard. What is custom is the exact size of the tunnel, and thus all the supports.
TBMs generally last a lot longer than the job, so a city could save a lot of money if they planed to keep using their TBM, constantly digging tunnels. Start with a north-south line, then use the same TBM to build an east-west line (or southeast/northwest), and so on. However most cities are unable to find the continuous budget to do that and so when they are ready for the next one the old TBM is no longer worth using, and in any case they no longer have trained crew to run it.
> highly geology-dependent,
Soft water logged earth needs different machines from hard rock. There are combination machines, but if you can determine which you need you save a lot of money ordering the geology specific machine. Get this wrong and you end up with a TBM and partial tunnel under the city.
> require a ton of babysitting.
12 people per shift is the number I've heard (NYC uses double which is one of the smaller reasons things cost so much there). The work is mostly routine though. However the TBMs do break once in a while and they everything stops while you repair them.
Think about every time you've been stuck in traffic because there are 3 roads that get you from A to B, and some jackass at city hall thought it would be a good idea to permit road work on 2 of them on the same day.
We are used to highway on-ramps being replaced in days to weeks, but removing an entire street, digging up everything under it, being careful not to nick the utility lines and pipes, then packing dirt back in around them without tearing them, then rebuilding the street on top, that's a lot. Especially for the businesses on that road.
We end up with transportation solutions that are suboptimal because we don't have the political will to tear off the bandaid. This on-ramp is in the wrong place because the old one was in the right place, but was built in a terrible way and had to be removed for safety while still handling daily commutes.
It helps when you can complete the project in a few years and not take a decade to build out a single line. So politics does have an impact on feasibility and practicality of C&C.
I used to walk over it almost every day when I worked at a coworking space in the old Lonely Planet HQ building. I think a lot of locals drive over it without ever realizing it's there.
Loud and sometimes vibration-inducing. But this seems potentially feasible to mitigate through sound insulation (both on the train and on the buildings; frankly, our buildings should have a lot more sound isolation than they do).
https://news.ycombinator.com/item?id=39401709 mentions newer elevated trains generating less noise, by designing for that requirement.
> they bathe streets/sidewalks/buildings in permanent shade
And permanent rain-cover. Seems like it'd often be a feature for many, though a bug for others.
The set back from the bridge to my building is about 5-10x as far from my window as an elevated train line running on an avenue would be.
I have new windows, plus a second set of quiet windows installed within the windows. Essentially quadruple pane windows. It makes them unusable for ventilation. Plus I have sound deadening curtains, sound dampeners on walls, etc.
Believe me, it is loud. There is no mitigation you can do to make it not noticeable. You can only make it tolerable. The cost to get it to that level is not insignificant.
Look at what they've achieved with this in Hong Kong. Plus the lines and stations basically pay for themselves due to revenues from residential property.
It's not apples to apples (light rail + heavy), but from experience the elevated parts of LA's Expo Line are a lot quieter than the Chicago L.
1. Elevated rail
2. Trenches with no cover
A series of campaigners in areas with higher property values wanted the trenches for “privacy” reasons and in the end many of them got them but the elevated rail receiving citizens got bike paths, basketball courts, car parks, improved walkability, generally more public space.
Having experienced the two, the elevated rail is far better.
The totally new line they are building though will be a TBM.
What? Sure, tunneling machines make less disruption but unnecessary? You still have to build the stations, entrances, and venting systems. All of those breach the surface and the space needed to facilitate the construction still causes lots of disruption.
But yes, more public transportation please. Lots of it!
For the 0.5 seconds you're next to them before you pass them or they pass you?
You also connect by just seeing what people are doing; you are out there with them. You have time and visibility to see the whole world, 360 deg x 180 deg.
Also you stop, maybe at a light, maybe to look at something, and see and talk to people there. You work out a traffic issue by talking and smiling, face to face, not by honking and banging on your dashboard. You see friends and say hello. You see somebody do something nice and say 'thank you'.
People assume it's not possible, that others are paranoid or bad-willed, and so treat others accordingly or at least don't try. Just try; it works fine. You need to read people and respect them - just basic primate social skill: obviously, some people are busy, upset, etc. and don't want to be bothered. But just trust people are good-willed and friendly, treat them accordingly, and you'll get plenty of good responses. It depends on your mood too; it comes through; if you are angry and trying to be happy, people can sense it - we all have years of experience reading others.
Even crazier is that people will actually argue against it, insisting it can't be true, objecting to anyone doing it or trying it. You have to wonder what that's about; that, I think, is very revealing about our society and some of its social trends.
the biggest impediment to cycling infrastructure is a social perception that cycling is elitist, and that spending money on it is a waste. if we can't even fund an 3m wide strip of asphalt or a couple of jersey walls to protect a bike lane, how are you going to find the money for tunnels?
On city roads, a lane is very valuable real estate. As a simple example, taking a lane out of a busy NYC street can have a big effect on car traffic.
> the biggest impediment to cycling infrastructure is a social perception that cycling is elitist, and that spending money on it is a waste.
IME it is elitist, unfortunately. I see mostly delivery people and 'elites' cycling in the city, and the cycling clubs advocate for a lot of infrastructure but they don't make much effort to bring people into cycling. The infastructure is highly underutilized - it looks like those cycling clubs insisted on building that infrastructure just for their small membership.
It's a real risk to the infrastructure: Eventually other people are going to notice and say, 'why are we bothering with it' and 'let's use the mostly unused space for this other project'.
Most cities have a large infrastructure to manage availability of parking, including laws, signs, meters, and meter enforcement. And in many of them, parking space utilization is very high.
Utilization is high because it's such an inefficient way to transit people that in most cities it's always at capacity.
So the a first step has been taken there, building the infrastructure. But they need to actively take the second step and spread cycling. 'Build it and they will come' doesn't seem to work.
Benefits of tunnels would be
* No need to stop
* Protection from elements (I for one would be far happier riding in summer if it wasn't sweltering, or in winter if it wasn't bitterly cold and rain)
* Mostly flat tunnels (No hills to climb up and over)
* Certainty that the route won't be removed for some reason
Of course would never find the money.
Given most bike paths in my city are empty most of the time, why would we spend money on more cycling infrastructure? The low utilization - not a social perception - are why spending more money would be a waste.
Are you sure those paths are viable to get places? In my city they appear that way if you don't ride them, but then you discover they can't get places because there is no useful connections. They have have a fence between them and stores. Or they only go through residential neighborhoods. Where I live they are setup to drive your bike to the trail head and go for a long exercise ride.
https://cloudfront.traillink.com/photos/big-dry-creek-trail-...
You can bike along Big Dry Creek Trail for about 10-15 miles without ever having to interact with car traffic. And it runs right across a major suburb of Denver. I actually use it almost every day to commute for errands
The tunnels do get a bit wet/impassable if it has rained or snowed heavily, or if the nearby creek is running heavily (which is rare). But people dont typically bike in downpours.
It doesn’t really matter, the point is that cyclists are totally separated from car traffic.
- Much cheaper to build than underground tunnels.
- Cyclists get a great view of the surroundings.
- Can be horizontal regardless of terrain, so that cycling is effortless.
- Can be climate-controlled, so people can bike all year round in any weather.
- Don't cause noise problems like trains or cars.
- And of course make cyclists 100% safe from cars.
I just thought of this idea and it's so amazing that I'm not sure why it's not everywhere.
Costs a fortune for window washers and graffiti removal.
They would also end up being used by squatters and for dumping trash.
Indeed, with how bad the housing crisis is in America, plenty of cities are having problems building any sort of public structure that has a roof on it...
If that theory is true, maybe one possible solution is to pay rich folks to get out of the way. The city can offer to buy their land, tear down their home, build an apartment building in its place, and pay them a cut of all future rental income from that building. This way they won't feel like selling now is missing out on future increases in land value. They can use the income to live comfortably somewhere else, and the city becomes free to build up.
Being underground for most of my commute would be utterly depressing, I enjoy biking to see the world, not to just teleport to a place.
If I bike on the street, I can stop at any location that addresses the street, same as any other street user. If I bike in the tunnel, there's not likely a ramp up for every business.
It gets worse when you don't have a bike tunnel on every street, because then I need to go out of my way to get to destinations off the tunnel street. And all the street users will yell at me to get back in my tunnel.
Yeah, I'm no city or urban planner - I can't solve every problem. It was a thought and I think there's some merit to it.
A summary is not the article, and the map is not the territory.
What do you think they would add, and why do you think that is a good thing?
In this case the article is worth reading. However it also is ignoring some important factors and so we still need to read the comments.
I know people and cities do not at all work in the way that I am about to describe, but imagine being able to shift the population of a city and all its necessary infrastructure to a second backup city so as to minimize disruptions.
All the necessary modifications could be made to the first city without affecting people living there because they would be living and working elsewhere until the work was complete.
Once the work is complete, everyone would go back to whatever address they previously had in the first city, and then work could start on improving the now vacant second city.
Obviously, there are lots of issues that I have not described like how this works when many places already have a housing shortage, and having to build that second city in an “empty” area that can be provisioned with the same quantity and quality of resources enjoyed by people of the first city.
In addition, I think a large complicating factor in construction today is something that I have not seen people talk about: when is it a good time to tear down existing structures. The lack of a “best before”/“expiration date” means structures stay up until failure or until the current owner wants to build something new in its place. The building stays up with possible inefficiencies (heating, cooling, energy use) that might be too expensive to remedy because of the age of structure.
Unfortunately, as far as I can tell the way democracies fund major construction projects is to first wait until the existing infrastructure becomes completely unbearably overloaded, and only then to kick off a process that will solve the problem in 10 years time.
In the Roncesvalles neighbourhood of Toronto (not as dense as downtown, but still an extremely walkable and bikeable commercial district), they had a major section of street closed for surface rail replacement for a significant amount of time, and it was very hard on businesses in that stretch -- people just didn't go there because it was noisy and dirty and unpredictably hard to get to and from places.
I don't think the objection in built-up areas is (just?) about driving.
Also selves in my library are redundant in ways road lanes are not. If you move a book across the library that isn't a big deal, but if they move the book to a different city that would be a problem. Likewise, even if there was an extra road lane someplace, if it isn't close and going in the right direction it is not redundant.