This is cherry picking. Look at the 10 years, or even lifetime, average availability. It's 90 or 95%. The reason for this bad number is because of delayed maintenance due to COVID.
> "serious consequences for power plant cooling systems, as the drought reduced the amount of river water available for cooling."
The reduction of power output of French nuclear was something like 0.30%. You read that right. So I would call "serious consequences" a blatant lie.
Average load factor for nuclear reactors globally hovers around 80% according to IAEA data [1]. In France the average is actually lower than this due to load following: by design, many French reactors don't always operate at full capacity because there isn't enough demand at off-peak times.
Few, if any, reactors reach 95%: planned outages for refuelling and maintenance takes up more than 5% of their time.
[1] https://pris.iaea.org/PRIS/WorldStatistics/WorldTrendinAvera...
My back of the envelope calculations say it's about 10 times less water to evaporate.
But guess what, people designing an building power plants know this. And whatever is built is the best compromise possible at the time. Backnof envelope calculus in 2023 or not.
Or at least close enough. I haven't checked if it is technically in the desert.