I checked the Wiki page: https://en.wikipedia.org/wiki/Vogtle_Electric_Generating_Pla...
> Two additional units utilizing Westinghouse AP1000 reactors were under construction since 2009, with Unit 3 being completed in July 2023.[9][10][11] This last report blames the latest increase in costs on the contractor not completing work as scheduled. Another complicating factor in the construction process is the bankruptcy of Westinghouse in 2017.[12] In 2018 costs were estimated to be about $25 billion.[13] By 2021 they were estimated to be over $28.5 billion.[14] In 2023 costs had increased to $34 billion, with work still to be completed on Vogtle 4.[15]
Those numbers are simply mind blowing. Why are these still built? How much solar/wind/battery capacity can 34B USD buy!?
I feel the same about the two big nuke projects in the UK (Hinkley Point C & Sizewell C). It makes no sense compared to solar/wind/battery.