Looks like the entire guide is here https://workmanship.nasa.gov/lib/insp/2%20books/frameset.htm...
Pretty darn cool little site, will have to mirror it.
Pretty darn cool little site, will have to mirror it.
Something that I definitely "did wrong" for decades was over-twisting stranded wires before inserting them into a crimp connector. According to NASA's guide, the correct way is to strip the wire and insert it without additional compaction. Their reasoning makes sense: leads to individual strand breakage and/or loose crimps.
Related, double-crimp terminals are designed to have one crimp over uninsulated wire, the second (closer to contact/space/barrel) mates with the stripped copper. Similarly, for twist-post connections, the first 1.5 twists should be of insulated wire, and then several more of stripped conductor.