Boeing to increase quality inspections of 737 MAX production
bbc.co.uk
bbc.co.uk
IBM decided to use a Japanese subcontractor to make chips for the first time. Since they didn't know what to expect, they put a clause in the contract stipulating "3 defects per 100,000." When they got the shipment, they also received a package with a letter: "We do not understand American business practices. Enclosed are your 3 defects."
Quality is a cultural value that's built into the system and Boeings culture seems to be garbage.
This is exactly what I thought of, when I head they were moving manufacturing to South Carolina. (I lived there while in grad school.)
If the alignment of incentives that brought us to this point have not changed, then we'll be back here again shortly. Lightning always strikes twice, and it keeps striking until you take down the damn lightning rod.
It's unclear who Boeing's audience is. I'd guess it's between regulators and electeds, though there may be investor pressure on their Board. I doubt the airlines have leverage, which means passengers don't either.
> WASHINGTON, D.C. — After taking decisive and immediate action to ground approximately 171 Boeing 737-9 MAX planes, the Federal Aviation Administration (FAA) today announced new and significant actions to immediately increase its oversight of Boeing production and manufacturing. These actions come one day after the FAA formally notified Boeing that the FAA has launched an investigation into the company as a result of last Friday’s incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight.
> ...
https://www.faa.gov/newsroom/updates-grounding-boeing-737-ma...
> This incident should have never happened and it cannot happen again. FAA formally notified Boeing that it is conducting an investigation to determine if Boeing failed to ensure completed products conformed to its approved design and were in a condition for safe operation in compliance with FAA regulations. This investigation is a result of an incident on a Boeing Model 737-9 MAX where it lost a “plug” type passenger door and additional discrepancies. Boeing’s manufacturing practices need to comply with the high safety standards they’re legally accountable to meet. The letter is attached.
> The safety of the flying public, not speed, will determine the timeline for returning the Boeing 737-9 Max to service.
Attached letter: https://www.faa.gov/sites/faa.gov/files/EIR2024NM420001_737M...
We need to send a strong message - if you do this you will end up impoverished and in prison.
It isn’t because they didn’t know how to do proper inspections but because they thought it would be worth it to cut corners.
Boeing "We were caught cutting corners, lets add some inspections and call it a day." I know Nuclear is super popular solution for Climate Change.
But remember, Boeing has peoples lives in their hands everyday, and the pressure to cut costs is still enough to overcome any qualms about deaths.
Remember the Boeing 737.
Remember how they tried to bypass regulations?
Remember outsourcing Software Testing to cut costs?
Now the door blow out?
Now a cracked windshield?
Cost Cutting will always win over lives.
So just remember that when advocating the return of Nuclear Power.
Chernobyl? Fukushima? These are NOT Exceptions when it comes to industrial accidents. They just happened to be what happened that wasn't caught or covered up and big enough to be remembered. In any industry with cost pressures lives are secondary.
Instead of a single plane, it will be countries destroyed.
A journalist needs to bluntly ask if they’ve been fired. If they haven’t, it’s all lip service.
That's exactly the wrong way to deal with the issue...
I’ve got a feeling that would not have been the approach when Boeing was at its best. Heads would have rolled.
If both failed at their jobs there's something a bit more smelly than just "individual responsibility" going on in an industry where process is extremely important for safety, don't you agree?
Fire the wrench holder and declare it fixed?
Instead of performative scapegoating, we should be asking how it’s possible that there is no documentation showing critical steps were done correctly.
Done and dusted, the angels in management hunted down the demon with the spanner that couldn't be bothered to do his job. He's probably just doing donuts in his lambo the cheeky beggar.
Also time doesn’t matter, they should have named records for the lifespan of the plane. Everything else is just destruction of evidence. We need every culprit of the 500+ deaths, or else Boeing has not improved a bit in quality.
fire the ceo. fire all the managers in the chain that were warned of issues, and asked employees to hide those by making false documentation.
and bar them, for life, to work in anything that has lives that can be put at risk.