Some quotes from this article: https://www.reuters.com/business/aerospace-defense/spirit-ae...
> As part of the production process, Spirit builds fuselages for 737s and sends them by train with the special door assembly “semi-rigged,” one of the people said.
> “They are fitted but not completed," the person said.
> At its Renton, Washington, plant, Boeing typically removes the pop-out, or non-functioning, door and uses the gap to load interiors. Then, the part is put back and the installation in completed. Finally, the hull is pressurized to 150% to make sure everything is working correctly, the person said.
I can imagine a diffusion of responsibility as to whose job it is supposed to be to tighten those hinge bolts. Spirit is installing the plug in a “semi-rigged” state. Boeing is removing the plug to load the interior, then reinstalling it. I’d hazard a guess that Boeing is not removing the hinges, because the plug can be removed without doing so. What if, when reinstalling the plug, Boeing workers just redo the stuff they removed? They tighten the vertical movement arrestor bolt, put the pin through it, and believe they have done their job? If they never messed with those other hinge bolts, they don’t bother tightening them?