Also looks like all C hold short lines have embedded guard lights - ie the stop "bar" on the way to the runway should have been flashing brightly.
* https://www.anaas.ana-g.com/img/business/general_aviation/pd...
Also looks like all C hold short lines have embedded guard lights - ie the stop "bar" on the way to the runway should have been flashing brightly.
* https://www.anaas.ana-g.com/img/business/general_aviation/pd...
It's also possible that there was more ATC communication that was not recorded. LiveATC comes from feeds provided by volunteers, whose receivers may be some distance from the airport and which may not receive signals 100% reliably. The investigators will have access to the official recordings made by JCAB (the Japanese aviation authorities).
Line up and wait sounds like something you tell preschoolers to do :-)
It could also be used while other aircraft/vehicles are crossing the runway at other intersections.
It is not “hey, multiple airplanes get yourself into a queue on the runway”.
It's used quite regularly at any moderately busy airport to reduce delays.
Examples where I've seen/heard it used in ATC comms:
Aircraft departing in sequence. eg A, then B. So: "Flight A (already lined up on runway 35L), cleared for takeoff runway 35L." (some short time later while Flight A is still in the process of taking off) "Flight B, runway 35L line up and wait"
Aircraft departing after an arrival. eg "Flight A cleared to land, 35L", and right as flight A has crossed the threshold: "Flight B, runway 35L line up and wait"
Also, as mentioned by others, when there are other movements to cross a runway between departures. eg "Flight A, at Foxtrot 5, cross Runway 35L. Flight B, runway 35L line up and wait"
https://www.faa.gov/air_traffic/publications/atpubs/aim_html...
Because it can be confused with "take off" as in "turn off"?
Point was that if the taxi clearance didn't include "hold (short of 34R)" it might be seen as contributing factor in line with ICAO[1] or FAA recommendations.
Also quite terrifying that, given all the equipment at Haneda and according to https://www.youtube.com/watch?v=6NbVdIoJsHY, around 2:45, with taxi lights fully visible at 2:53, the DH8 was lined up on the runway for more than a minute before being run over by the A350.
But as you say, preliminary report should already have a clear timeline of the tower tapes.
1: https://www.icao.int/safety/runwaysafety/documents%20and%20t...
The word "clearance" is used uniquely in the context of landing and departing exactly to avoid mistakes and has to be repeated again by the aircraft before ATC confirms.
The word "cleared" is often used for IFR clearance delivery as well which gives you permission to navigate via a planned route to a particular point, so it's much more common than just takeoffs and landings.
They were out of service:
https://www.reuters.com/world/asia-pacific/police-probe-poss...