If your transmission line to your nuclear power station trips, you need reserve capacity elsewhere to serve the load.
Gas and coal generation all need storage to run reliably.
If you are going to be an armchair power system designer and you want to ‘gross up’ the cost of capacity and storage into the cost of renewable generation, then be consistent.