Much of North America may face electricity shortages starting in 2024
newscientist.com
newscientist.com
"Chemicals producer BASF to axe jobs at energy intensive production sites in Germany" "Tyre maker Michelin announces closure of German sites" "Rust belt on the Rhine"
You know something else? The majority of chemical sites in Germany is old, and environmental constraints became quite severe. Guess where new investment goes then.
The rise of the fascists, left an right, is due to refugees and inflation - and Trump style conspiracy theroies. And vaccs. But mainly refugees. Just talk to some AfD voters.
TLDR: Don't claim the wrong counterexamples for your wrong cause.
I guess it is unavoidable given those plants can poison a whole country and their neighbors if not maintained properly.
Oh. And built by the lowest bidder near you where non team players are fired pre-emptivly. There is no way a trust modern corporate management philosophy to build nuclear power plants.
The sudden shift in the nuclear power "public sentiment" is really strange and feels artificial.
So nuclear starts to look very attractive because of the guarantee of continual high power output with few dependencies as long as you have the uranium, and isn't as unreliable as renewables.
So if nuclear ever became a staple, you'd end up needing to resort to salt-water extraction, or developing breeder reactors. Both would send costs skyrocketing. Salt-water extraction is also going to run into environmental issues given you're talking about processing literally trillions of tons of water (uranium's about 3 parts per billion in saltwater). Breeders also substantially up the stakes in terms of complexity and risk.
If you'd indulge my curiosity, what would be your opposition be to something like solar + artificial hydroelectric? It's relatively cheap, infinite (well subject to access to the materials necessary for construction of solar panels), completely safe in any scenario, and things like artificial hydroelectric take care of the biggest issue of day/night production.
[1] - https://www.scientificamerican.com/article/how-long-will-glo...
Anyhow, nuclear power plants are in them self a major national security weakness. Especially with these put small reactor everywhere cracy talk. But then again "national security" is about "security" about as much how the "defense industry" is about "defence".
I sometimes feel that nuclear power is a proxy discussion for something else that is also not very popular among the voters. It kinda makes sense if you just replace "power" with "war".
Isn’t the impossibility proof only as strong as the assumptions put in?
Passive cooling and automatically, gravity controlled control rods to deactivate the reaction are major innovations. Smaller sized reactors that have better neutron economy also reduce waste and have lower total risk
Nuclear is dead for everything except science, medcine, political or military reasons. All of which are valid ones by the way.
It has never panned out. Most recently the company furthest along the licensing process, NuScale, cancelled their project in Utah due to spiraling cost increases, before they even started to build.
THE FORGOTTEN HISTORY OF SMALL NUCLEAR REACTORS
https://spectrum.ieee.org/the-forgotten-history-of-small-nuc...
In both cases, the underlying technology has worked for a while, and the challenges are only tangentially related (NIMBY, lack of production scale, scaremongering for nuclear), but solveable.
All while we have solutions, on the market, that are cheaper, faster and easier to deploy.
The costs of the French nuclear scale-up: A case of negative learning by doing
https://www.sciencedirect.com/science/article/abs/pii/S03014...
This study does not include their most recent attempt at Flamanville.
> Construction on a new reactor, Flamanville 3, began on 4 December 2007. The new unit is an Areva European Pressurized Reactor type and is planned to have a nameplate capacity of 1,650 MWe. EDF estimated the cost at €3.3 billion and stated it would start commercial operations in 2012, after construction lasting 54 months. The latest cost estimate (July 2020) is at €19.1 billion, with commissioning planned tentatively at the end of 2022.
https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plan...
If everything was rosy in the renewables, then why not. But we don't have storage, we don't have high-capacity long-range (thousands of kms) energy network, most of the production capacity is in China ...
Both directions have its risks, I think a wise choice would be to pursue both to avoid putting all eggs into one basket.
Besides a grudge against Florida, can you show any harm nuclear energy has caused in the last 20 years in the US?
It’s not political, it’s unpopular broadly.
For nuclear it’s also a local politics problem, not national problem generally: people don’t have an issue with nuclear in general, but they do have strong opposition for it being built near where they live.
Uhh yeah? Because it's been dead since the 1990s? You can look at a graph of new nuclear power platnts and see it curtail off after a peak in the 90s.
> It’s not political, it’s unpopular broadly.
When it was a major political issue, the anti-nuclear advocates were almost entirely on the left. It was seen as part of the environmental movement (which has been left-leaning).
But sure, this time it will certainly be different!
All while we have solutions, on the market, that are cheaper, faster and easier to deploy.
The costs of the French nuclear scale-up: A case of negative learning by doing
https://www.sciencedirect.com/science/article/abs/pii/S03014...
This study does not include their most recent attempt at Flamanville.
> Construction on a new reactor, Flamanville 3, began on 4 December 2007. The new unit is an Areva European Pressurized Reactor type and is planned to have a nameplate capacity of 1,650 MWe. EDF estimated the cost at €3.3 billion and stated it would start commercial operations in 2012, after construction lasting 54 months. The latest cost estimate (July 2020) is at €19.1 billion, with commissioning planned tentatively at the end of 2022.
https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plan...
And that is as far your knowledge goes.. just please put real valid numbers to it, and don't start shaming.
Nuclear only exists in the first place due to political decisions. It's massively unprofitable if you actually include all costs even at current inflated electricity prices.
Why not build gas and battery storage for renewables instead? It would be better by every measure, including cheaper, faster to build, safer, and more reliable (due to being distributed).
They say that demand is expanding faster than ever. They claim that this will lead to shortages, but they forget that the power market is a market, and thus:
* prices will rise in peak hours, and industrial demand will respond
* the raised prices will cause a lot of new supply to be added, bringing prices back down.
It’s only a problem in places that cap industrial power prices or that prevent the construction of new power plants. (This will be mostly solar and batteries.)
One thing lots of people miss is you have to invest in reducing demand for heating by subsidising good practices like heat pump and renovations. This is what a state monopoly can do even if the government doesn't want to invest.
The ones being removed are all older facilities that mostly don't produce much power.