Edit: if you’re referring to Brightline West, construction hasn’t even started.
Acela is like a Formula 1 car that gets to do one quick lap on a nice racetrack, then has to take another course through bumper-to-bumper traffic for the rest of the race.
I just rode it last week, and it actually took 3 hours, not 3.5.
Most of the NEC corridor from DC to NYC has a speed limit of 125mph; from NYC to New Haven, it's generally 70mph (!), from New Haven thence to about Kingston generally 90mph, and from there to Boston it's mostly 150mph. Given the density of the corridor, Amtrak should be trying for 150-220mph speed limits, but even 125mph is generally agreed upon to be the lowest end of HSR.
A surprisingly easy way to make the train go faster would be to redesign the switching sections before large stations to allow trains to go faster through them. You can probably cut around 10 minutes out of the entire length with an investment of less than $100 million just by doing that.
So maybe it'd be a few billion at least. Not to say they shouldn't try. But I expect it'll be over budget and behind schedule, it would never happen like Brightline where they broke ground ASAP and just kept building until it was done.
In the UK and Europe, 125mph (~200 km/h) is considered the top speed limit of conventional rail. Legally, operating speeds beyond that require full in-cab signalling, positive train control, upgraded safety and structural requirements, and whatever else is required for HSR. Further, all the trains operating on a section of line need to be upgraded to those standards if any of them are to run at speeds > 125mph.
The UK does have some sections of conventional line that are capable of > 125 mph running, and even have done so in the past, but this is no longer allowed.
I’m not sure if the US has similar rules, but it wouldn’t surprise me if so!
> ”A surprisingly easy way to make the train go faster would be to redesign the switching sections…”
Yes, generally speaking, fixing the low-speed bottlenecks will typically yield the biggest benefits for the cost in terms of overall journey time.
UK is part of Europe. It's like writing "In California and the USA", or "In Mexico and North America".
Without such qualifiers, the meaning is clearly "continental Europe", which is a meaningful distinction when it comes to the rail, because they have two almost entirely disjoint rail systems.
Ok, yes, technically the European rail system does actually physically connect to the UK main lines at a few places on HS1 between London and the tunnel at Dover, but no public train uses such connections. Functionally, European and UK rail are essentially entirely separate in terms of operation, regulation and technology. Whereas on the Continent, trains regularly cross between countries and the whole system is much more-but far from entirely -integrated, politically and physically (see https://en.wikipedia.org/wiki/European_Rail_Traffic_Manageme...).
Probably why I mentioned political integration in the sentence then.
But at this point I'm akchually-ing an akchually to an akchually!
That's not true. There are some local connections and integrations, but outside of high speed rail which is generally built using the same standard, each country has their own load gauge, electrification standard, signalling system, etc. Cross-border trains are usually special traninsets built to multiple standards to be compatible.
There is progress on more integration and standartisation, and pretty much all new lines are built to the same standards, but the vast majority of rail is existing.
(This doesn’t make the situation any less embarrassing.)
I think "passenger rail" implies passenger trains running on the "full/main" railroad lines that run all over the US. Something like light rail or local transit typically have their own discrete lines, in my experience.
Again, could be wrong, that's just how I interpret it.