You need to look up k at the labor cost and time taken to building a brick house in addition to material cost. My GC took a week to get the concrete foundation but did the sub floor and framing in a weeks time. It is incredibly fast to build and very efficient use of labor. The homeowner benefits as the labor cost is lower.