Wind and solar are terrific but unreliable. What if it’s not windy or sunny?
So we need something to replace coal, which provides the grid’s base load. That thing can basically only be nuclear at this point.
The grid is really delicate. You need just the right amount of power to keep it at 50Hz. Too little, brownouts. Too much, overload. So you need a really really stable base load, and one that you can turn up a little and down a little whenever you want: to account for the wildly varying input from wind and solar. :-)
Almost more important than the power generation in many countries these days is the grid. With no grid, or a poor grid, or a grid that can’t store energy, you can build all the wind you want: but you can’t bring it online.
> The median approval time to connect to the grid for a new US power project has climbed by 30-days/year since 2001; and has doubled since 2015, to over 1,000 days (almost 3-years) in 2021. Wind and solar projects are now taking longest to inter-connect, due to their prevalence, lower power quality and remoteness.
https://thundersaidenergy.com/downloads/renewables-how-much-...
> Around £200bn of renewables projects are facing waiting times of 15 years to come online, jeopardising plans to create a net-zero power grid by 2035.
https://www.edie.net/waiting-times-for-renewables-projects-r...
> They have expressed concerns that wait times of up to 15 years have made it difficult to attract investment as the UK competes with the $369bn (£295bn) US package of climate subsidies.
https://www.theguardian.com/business/2023/may/16/grid-connec...