We had an outage a few years ago on Black Friday; we had been getting our DC to purchase and rack servers for us for years, and the data centre had IIRC four separate circuits that our servers were on depending on which rack they were in. Unfortunately, we hadn't provided them input into which servers were which purpose, and we occasionally repurposed hardware from one service to another.
This resulted in one of our microservices existing entirely on one circuit, along with significant swaths of other services. We also overprovisioned our hardware so that we could cope with huge increases in traffic, e.g. Black Friday/Cyber Monday weekend. Generally a good idea, but since our DC obviously didn't have any visibility into our utilization, they didn't realize that, if our servers suddenly spiked to 100% CPU use, it could triple our power usage.
Easy to see where this is going, I'm sure.
The microservice which existed entirely on one circuit was one of the most important, and was hit constantly - we were a mobile game company, and this service kept track of players' inventories, etc. Not something you want to hit the database for, so we had layers of caching in Redis and memcached, all of which lived on the application servers themselves, all of them clustered so that we could withstand several of our servers going offline. This meant that when we got a massive influx of players all logging in to take advantage of those Black Friday deals, the service hit probably the hardest was this service, and its associated redis and memcached clusters, as well as (to a lesser extent) the primary database and the replication nodes - some of which were also on the same circuit.
So as we're all trying to tune the systems live to optimize for this large influx of traffic, it trips the breaker on that circuit and something like 1/3 of our servers go offline. We call the CEO of the DC company, he has to call to figure out what the heck just happened, and it takes a while to figure out what the heck just went on and why. Someone has to go into the DC to flip the breaker (once they know that it's not just going to fly again), which is a several-hour drive from Vancouver to Seattle.
Meantime, we all have to frantically promote replication databases, re-deploy services to other application servers, and basically try to keep our entire system up and online for the largest amount of traffic we've ever had on 60% of the server capacity we'd planned on.
I was working on that problem (not just awake, but specifically working on that issue) for 23 hours straight after the power went out. Our CEO made a list of every server we had and how we wanted to balance them across the circuits, and then the DC CEO and I spent all night powering off servers one by one, physically moving them to different cabs, bringing them online, rinse repeat.
TL;DR electricity is complicated.