In Europe, it seems like HSR stations are often in greenfield locations outside of town. In California it became some hypothetical "downtown revitalization" scheme. But Bakersfield etc really should want better local public transit.
This is not true at all. If this were the case, it would thoroughly defeat the core advantage of HSR over air travel: fast connections between city centres without requiring passengers to travel to some far-flung port of call, adding an additional two hours at least.
All the Gares, Hauptbahnhofs, Staziones, Estacións, and St Pancrases of Europe are bang smack in the middle of their respective cities, and almost all predate the introduction of HSR by around a century or so, barring renovations here and there. The only truly brand-new HSR stations are in Japan and China.
Plenty of HSR within European cities use existing infrastructure and 1435 mm standard gauge, and travel at lower speeds to account for this. The trains usually only get up to speed as they leave the city and enter dedicated high-speed railways with grade separation, concrete sleepers, reduced turning radii, etc.
The French came here and recommended a greenfield route, which is what they built in France, you can see the bypasses on google maps. They concluded that California is full of shit, and built HSR in Morocco instead.
My take is there are a bunch of reasons to build the thing. None of them on their own is convincing but taken together it's reasonable.
Things like.
All the major airports in California are maxed out and expanding them would be near impossible or very expensive. You can look at costs to do that in non US countries. I think $15 billion for two runways at Heathrow. Imagine doing that times six.
Growing population in the central valley makes the current at grade rail crossings untenable.
Distinct lack of high speed commuter rail in the major metro's.
This is absolutely not true in France, where the TGV mostly takes regular lines to exit the suburbs of every city it goes through.
> It appears in the US many of these plans rely upon lower costs where the train is built on the ground. So they end up building tons of small bridges, regrading roads, moving wires, moving drainage, communication equipment etc as the train interacts with existing infrastructure
Building elevated is a shit-ton more expensive
That's great that France has the TGV mostly on the ground as they exit the suburbs of every city -- whats the typical configuration of the crossings for roads? Does the road basically go in a small tunnel under the crossing or does the track become elevated temporarily? Or do they actually allow cars crossing the tracks at grade?