SpaceX Prepares For April 30 Launch To Space Station
wired.com
wired.com
As I've seen firsthand, the waste in typical defense contractor programs is obscene – it's so great to see someone doing something about it. Hopefully with much lower cost to orbit, we'll see a revitalization of the commercial launch market as well.
To GTO those numbers are 2400kg and 4680kg.
The "Launch Payload" of the Dragon spacecraft (6000kg) appears to be approximately the Mass to LEO of the block 2 (10450kg) minus the mass of an empty Dragon spacecraft (4200kg).
I remember working on a simulation of one aspect of the system. I wasn't allowed to know the real operational parameters of the system, which makes testing difficult. So when testing my code I could only guess, plugging in numbers that seemed reasonable to me. Then I'd give my code to my team lead, saying "I think it works now. Want to try it?".
That said, of course there are even more important key senior staff that the whole enterprise rests on...
That wasn't as cool as my other friend who programmed the school's online class signup system...
I read the SpaceX pages, reports and updates with the same excitement I had when I read about the Saturn V, the Apollo craft the Lunar Lander, the Shuttle, and the engineering and esp. the control computers behind and embedded in all those craft.
To be involved with SpaceX, designing systems and writing and testing the software and the hardware systems they control must be very exciting right now. That would be something!
The final polished product of my work was reviewed and tested by higher level engineers. In R&D, you just get it to work as best as possible, and move on to the 100 other tasks lined up. If you want to see a truly fast pace working environment, work at SpaceX.
I guess they figure if they simulate it enough, they can test out the bugs rather than being very careful about putting them in.
And I thought shipping in the UK was expensive...