I really miss being served by SVP.
I really miss being served by SVP.
In addition to dealing with inflated California construction costs, they also routinely block construction projects and urgent home repairs.
That the state didn't simply take the assets and indemnify the previous owners for the liabilities (thus turning it into a giant "municipal" power company) speaks to corruption in CPUC and the state in general.
We have 3 damns generating power very close by us, two that are pretty big, but I doubt that has much to do with our rates. If anything it's slowed the need for a natural gas or coal fired power power plant nearby, but there are those within 50 miles near the bigger metro areas around us. No nukes close by though.
And their website is approximately 3141 times better than PG&E's. Electrical reliability and customer service are better, too.
It's hard to overstate how much better municipal power companies are compared to for-profit ones (LADWP is better than SoCal Edison).