Building new catenary systems can be expensive (anywhere between $1M-$5M/mile in the US), but can possibly be avoided with batteries and charging at stations (or energy provided via rails).
https://www.weforum.org/agenda/2021/07/clean-energy-green-hy...
Can you just hire Japan Rail to build it for you, then?
The third-party claims about the SNCF proposal mutated a lot in response to evidence that seemed to contradict them, the most recent form of it acknowledging that SNCF publicly supported the CV alignment that the story says they later opposed, and also paints the opposition coming after federal funding waa committed under ARRA tied specifically to specific projects in the Central Valley alignment that SNCF America was said to have then opposed.
When the UK electrified the East Coast Mainline in the 80s, that cost an inflation-adjusted GBP 600M, for 397 route miles. At that time 1 GBP was approx 1.5 USD.
Using 1.5, that's $2.26M/mile.
PS: Even in Japan, almost all freight travels by diesel to this day... they run on separate tracks to the passenger trains, although freight in general in Japan is less important since they don't have much bulk cargo, being a major exporter of neither food nor minerals.
HEMUs for these types of services I don't understand. It's laudable that transit providers want to get away from fossil fuels (and putting up overhead wire is a long and arduous process, fraught with delays), but getting hydrogen today almost certainly isn't "green". Maybe "Technologieoffenheit" virtue signalling.
But looking at the plans of various german transit agencies for future service on non-electrified lines, it's pretty obvious that hydrogen has already lost for rail-based transit, with almost every tender that doesn't prescribe a technology going to BEMUs and studies showing that BEMUs and partial electrification or full electrification almost always makes more sense than HEMUs
https://en.wikipedia.org/wiki/List_of_countries_by_rail_tran...
If the line is electrified then freight travelling on it will be travelling on electric trains.
The level of rail maintenance in America (barely any) is illegal in the rest of the western world. Tenders for maintenance specify certain speed and safety limits that basically require rebuilding every few decades.
Only on private rail could a hedge fund approach work, where the capital of the infrastructure is extracted by way of not maintaining it, but instead slowing trains down and increasing their length to compensate for bandwidth loss.
Like what's the cost per mile to install overhead wires? Comments in an online magazine says $1M/mile[1]. You can buy 5-10,000 kwh worth of batteries for a million bucks.
EU wide it's 56%, brought up a good chunk by Scandinavia and Switzerland. Italy and Spain are the only two countries in Southern Europe over 50%.
There are a LOT of infrequently used industrial lines that see no passenger traffic, and maybe only see a freight train once or twice a day, if that.
Rebuilding tunnels and bridges is expensive - tunnels especially are practically never built much larger than required. Stations, depots, carriage washers, and other related infrastructure will need to be rebuilt or heavily modified to account for the extra height of the panto, wires, and poles.
If you're building NEW track, sure, OHLE is the way to go. But there is well over 1 million route kilometers of rail in the world, and less than a third of it is electrified. Of the countries having at least 20,000km of track, only India and Japan are above 70% electrified. Cost of electrifying is estimated at at a miniumum of $1 million per track kilometer. (10 route km of a quad-track mainline would be 40 track km).
A large freight yard might be 40 tracks wide by 2 or 3km long... that's over $100m right there, and that's assuming the yard tracks are spaced widely enough, which they aren't always.
A diesel will have to be dispatched… except it’s entirely possible it won’t be able to get you because there are trains stuck between you, and it’s not like they can pull onto the shoulder.
These sections are sometimes miles long.
Sorry, but never heard of that here, neither for the local trams, nor the >50% electrified on rail.. it is more likely some unhappy guys cut the signaling wires. Where is that?
If it's happening all the time you're doing something wrong.
https://www.sfexaminer.com/news/one-injured-after-overhead-m...
https://sf.streetsblog.org/2020/09/02/bad-splices-point-to-f...
https://www.cbsnews.com/sanfrancisco/news/muni-wires-fall-on...