I'm betting most of the problems are less about variance in execution time and more about measuring the right tasks at the right granularity.
The mapper example is actually particularly pertinent. Hadoop's GUI shows me the progress of my M/R jobs with a bar, but it is as dependent on the amount of other tasks running on the cluster as downloading a file is dependent on the traffic in the network. There is no sane way to accurately estimate the amount of time a M/R job is going to take a priori, as far as I know. A stochastic method would be too variable and a method playing clever tricks with psychology seems especially insidious, from an engineer's perspective. You might as well replace it with an "Are we there yet?" button that responds to you in a soothing voice "Not much longer now".
Even for time estimates - I don't sit and watch the bar move from start to end. I'll look at it for a few seconds, notice how fast it moves, and go do something else. That "psychologically friendly" progress bar that starts slowly and accelerates will do nothing but confuse me.
With respect to download progress bars, one approach is to use an exponential moving average:
http://stackoverflow.com/questions/933242/smart-progress-bar...
Briefly, they took a process that proceeded linearly, applied an arbitrary function to the current progress, and displayed the result in the progress bar.
The conclusion is that time taken is perceived as less when the progress appears to start slowly and then accelerate, even when the actual total time taken is the same.
1. Make the errors amusing to the user. For instance, if the operation goes over the estimate, go ahead and fill the progress bar to 100%. Then pause a second, and act embarrassed. Change the progress text to something like "Uhm...err...well, this is a bit embarrassing...", then go one to explain it's taking a little longer then expected.
Then say something like "OH MY GOD! THAT SPIDER BEHIND YOU IS THE BIGGEST I'VE EVER SEEN!!!". While the user is presumably turned around to check out the giant spider, drop the bar back to 80% or so, and pretend nothing ever happened.
2. Report progress bar inaccuracy back to the server, which can look and see if there thing is being consistently off in one direction and make a correction factor available to subsequent users of my software.
Might also stats to the user at the end of the operation, telling them things like "This progress bar was off by 10%. The average user's progress bar was off by 20%. Congratulations! Your computer was more reliable and consistent than average!"
For bonus points, display the underlying data in some way so that I can draw my own conclusions, supplanted with "sidechannel" information I am likely to have, e.g. previous experience with the process if nothing else. Extra bonus points if you make this information optionally visible so that I can tune it out if I don't need it and my mom doesn't get confused. I really like modern copy dialogs in that regard (and not-so-modern ones on decent file managers).
If you can't make the estimate reasonable at all, don't make a progress bar and display progress in some other manner instead. E.g. if you are copying files, and you have no way of knowing how large each file is, consider simply putting down a simple count ("Files copied: x/y") and if at all possible some indication that the program is progressing at all ("Current speed: x MB/s").
Finally, please do try to add some kind of progress information for any task that can take more than a few seconds. It's incredibly frustrating to stare at a "busy" mouse pointer[1], having to guess whether an application has locked up or if it's just taking extremely long. If you get it wrong, you usually end up re-trying and being faced with the same situation. I have had to play detective around applications misbehaving that way, and having to use top, iotop, etc. to determine whether an app is using CPU, hard disk or network resources is both a lot of work and non-conclusive (not to mention beyond the capabilities of most users).
(This started out as a short reply and ended up quite being a more general rant; the second time this has happened to me tonight. Sorry about that.)
[1] Though terminal utilities are often just as bad, because they're not just designed with interactive usage in mind. However, each individual terminal utility tends to do less, which means complex process are broken down anyway, which yields some progress information.
One of the examples was bytes downloaded. The reason I, and I suspect other users, interpret that as % downloaded is that in most interfaces (e.g., iTunes, Firefox, Safari), below the download progress bar, it says "XK of YK". (There is also an estimated time remaining, but it's typically not on the left side.)
In other cases (installs), yes it makes sense that the simplest interpretation is time, because that's what we care about when installing: how long until we can use the new shiny widget.
It's by far one of the most deceivingly difficult problems I've worked on. If anyone cares for more info, this is what the restore process looked like:
* Single thread that determines the list of files that need to be restored, asynchronously feeding to
* Multiple threads that download the files from our servers as ZIP files, then each queue their results to either
* A thread pool with a dynamically adjusted number of worker threads for the unzip and decrypt process, extracting the files to their final destination, OR
* A different thread pool with a fixed number of threads that does block-level (byte-level differential) restore, which may, when processing a file, need to add files to the first thread mentioned in this list
To pull this off, we had to modify the backup process to store enough info to be able to calculate, immediately when the user presses "start restore," the total number of files to be restored, the total number of files to be downloaded (which may be different because ZIP files can contain many small files to minimize latency and overhead, and also because the byte-level differential backup has "backup run" outputs), the total bytes to be restored, the total bytes to be downloaded, the total bytes to be unzipped, etc. etc. etc.The progress bar had to move "smoothly enough" across the entire backup. If you're restoring a hundred and one files, 100 of which are tiny and in a single zip file, and the 101st being a huge differentially-backed-up file, the 101st will take forever and the progress should reflect that. For multi-GB restores, the math could give you 100% (with rounding) for over 10 minutes - need to jam the progress bar at 99% until it's actually done or you'll get complaints. Likewise can't keep it stuck at 0% even if it rounds down to 0% or you'll get complaints.
At the end of the day, the formula I came up with weighted for the following:
* The number of files to be downloaded
* The number of files to be restored
* The size of the files to be restored
* The number of files to be decrypted
* The number of files to be differentially restored
* The number of files required to differentially restore a single file
* The size of the files required to differentially restore a single file
* The size of files cached locally that can skip download
* The number of files coalesced in a single ZIP archive
* The destination drive (externals are slower than internals)
* The average download speed
Fringe cases such as attempting to restore a single file that was contained in a single ZIP with a hundred other files when tested with a naïve algorithm would end up giving negative progress as if you adjust for the factors listed above you'll end up needing to factor in a (relatively) "huge" number of bytes for download while you're actually only grabbing a single "small" file from the ZIP. Basically, if you adjust the weight of one factor for one case, you'll end up getting non-smooth progress bars for other cases as a result. Took a lot of charting, a lot of trial and error, a lot of user feedback (each time from people that had never participated in the test before to prevent any sort of bias or preconceived notions) to finally get it right. That code is now classified as "no one touch it, no matter how trivial (you think) a bug you found would be fix."So, yes. Progress bars lie. It takes a shitload of work to make pull these lies off, and if they told the truth, your users would really make sure you never heard the end of it. Even if you've already technically done 80% of the work, if only 20% of the required time has elapsed, that progress bar had damn well not say 80%. Or 20% either, for that matter.
Maybe I'm unusual. Aside from tar'ing data to tape on elderly 'nix machines, years ago, nearly all of the backup / restore jobs that I've done have been for work - tape libraries, dedicated servers, etc.
I don't _care_ about progress bars, accurate or not. I'm not going to watch a nifty GUI screen for hours - kick off the job, give me an estimate, notify me when done.
People really care enough to make it an item worth that much skull sweat? Weird.
Unfortunately, yes. The B2C desktop software market is such a cutthroat environment both in terms of what users expect and how much competition there is. It's an entirely different beast and the devil really is in the details. For some reason, bloggers, software review sites, magazines, etc. will really run desktop software through the mill and pick at the nitty-gritties in a way that they don't with webapps. Perhaps because with webapps the user experience is rather ephemeral and can be easily patched or fixed whereas with desktop apps everything has a very "final" feel to it.
The niftiest progress bar I've ever seen wasn't a progress bar.
It was a little morality play.
As the game installed a dinosaur slowly bounced across the installer window and _ate_ a hapless user .. who didn't send in his registration card.
Still remember that, seventeen years later.
It's actually issued to Namco, but it seems to describe exactly that.
I think I have a PSOne Namco game with a preloader, possibly Tekken. I never so much as dreamed that was patented, though.
Pity. If Oracle has wee little cartoon dinosaur mayhem I'd be a happier guy.
So what I did was simply calculate how long the previous run took, add 10%, use that as my new baseline, and show progress based on the percentage between. Often this would mean the progress bar went straight from 93% to complete - but this was preferred (better than stalling at 100% for minutes at a time).
Eventually we automated the sync process, and the customer was happier looking at the occasional exception report instead of a progress bar.