You voted for California rail but nothing high speed was ever proposed.
The proposed rail line you are referring to was a normal speed train and didn’t even complete the SF to LA trip in two hours.
Which is to say: we would have achieved, in 2030, what most of the world achieved in 1990.
Buy the land, build the rail connector and enjoy the boost in land value you created.
It feels like everyone wants rail, benefits from rail and advocates for rail, but no rail gets done.
https://www.npr.org/2020/01/29/799962246/brightline-nations-...
Brightrail runs 130 kph trains through populated areas, mostly at grade including crossings. Caltrain runs a comparable system in length and speed and sees roughly half the annual deaths. Do you have a better explanation?
I just read the article you linked, and while I am just taking the article interviewees word for it, it sounds like they are concerned about pedestrian control at intersections in suburbs. Fair enough concern, but that is going to be up to the state to regulate I think. Rail companies will cut where they can, it's still a heavy industry, not exactly the poster children of ethics.
Either way, in socal the metrolink trains operate at grade going pretty fast up to 80mph and you don't see so many accidents. I'd blame some other factor over the fact the train runs on the surface behind a gate.
Either way, in socal the metrolink trains operate at grade going pretty fast up
to 80mph and you don't see so many accidents. I'd blame some other factor over
the fact the train runs on the surface behind a gate.
Such as? Brightline has the worst record in the country. In the Bay Area Caltrain runs similar speeds, for a similar length of track, and still manages half the annual deaths. And, yes, Caltrain deals with people on the tracks fairly regularly. And, yes, I know nothing's perfect – someone just managed to drive right into a BART train last Monday. Regardless, Brightline is doing a worse job than any other rail company and they're resistant to any obvious (and relatively low cost) improvements. Caltrain, while already having a better safety record, is moving towards grade separated crossings to safely facilitate higher speeds. Grade separation is way more expensive than the shit that Brightline is refusing to do.Too bad we are incapable of building one.
The new Caltrain service should be faster and more reliable, so even if HSR is never completed, the Bay Area will get a nice upgrade in its regional rail system.
Environmental clearance was known to be quicker there, which met the priority for shovel-ready projects in federal funding being distributed as part of the 2009 stimulus, and the fact that it was in a more economically precarious part of the state was also in line with the funding concerns. It didn’t hurt with the state or federal politics of funding that that was in a more Republican area of the state, either. At the same time, the Bay Area and LA basin were getting a lot of the initial investment for “bookend” projects to improve existing transit systems both for the independent value that produces and as eventual HSR feeder systems.
Sac to Stockton was never even part of the Phase I plan anyway, but part of the distant idea of a Phase II extension after the SF-LA run was complete that would add Sacramento and San Diego.
TL;DR the physics is really hard and California might not be the best place for it.
https://caseyhandmer.wordpress.com/2022/10/11/why-high-speed...