Did I Uncover a $100M Mistake with the Millennium Tower “Fix”?
youtube.com
youtube.com
I don't live anywhere near S.F. and my engineering background is limited (undergraduate degree, nothing professional), but I agree that the video author does have a valid and very important concern.
It would've been a lot nicer if he shortened the video and if he showed his calculations for the steel bar that the all-thread is transferring the load to.
The project to prevent the tower from sinking further, relies on four small steel plates that are supposed to bear a large amount of load. These plates are encased in concrete and therefore cannot be checked or maintained after installation. The video creator can't find any evidence that the project engineers calculated whether the plates can bear this load, and his own calculations suggests that they cannot.
That in itself is not damning. The real question is how do they intend to inspect the threaded connection to the concrete? To avoid frequent inspections you would want to over engineer it so it lasts for hundreds of years even if the building will be torn down in 15 years but the steel bar is ridiculously undersized and should be considered sacrificial as well but it cannot be replaced nor inspected.
What is really disappointing about this whole project is that nobody stopped and thought about building a model for dynamic and static load tests to prove that it works in reality. After all, this has never been done before on a building of this scale.
The "same" cables on the "near" pylon #11 (the one that collapsed was #9) had been replaced in years 1992-1996 because of severe corrosion.
Everyone was expecting that the same replacement would have been soon made on the pylons #9 and #10 but the inspections (circa 1991) that were made (boring holes to visually inspect the cables in a few points) and, although these inspections (obviously) showed some relevant corrosion it was underestimated, and anyway no correction measures were taken in a timely manner (please read as in the next 25 years).
That the bridge was overloaded (by traffic as much as 4-5 times the amount it was designed for originally) and that it needed interventions was a known fact and starting 2006-2009 there were several projects about demolishing and rebuilding it that were never finalized/approved.
A new inspection made in 2015 evidenced the very poor state of the cables, the results of this inspection were once again underestimated or even falsified.
A project was made for replacing/reinforcing the cables in 2017 (20+ years after the works on #11 and 2 years after latest inspection) and the bid for it was published only a few months before the bridge collapsed in 2018.
It was a story of incompetence, sloppyness and greed.