These solar projects are good to start as they could empower more african nations with cheaper electricty. We just need more electricity everywhere if were going to drop the reliance on oil.
These solar projects are good to start as they could empower more african nations with cheaper electricty. We just need more electricity everywhere if were going to drop the reliance on oil.
Specifically, the power price across the UK is the same everywhere. However, there isn't infinite transmission capacity. So, if you generate power in one place, but the power network cannot transport it, you get told not to bother producing it, but you still get paid, and you get paid compensation on top.
You know what's better than producing power... being paid to produce power, paid extra compensation, and then not need to actually have those wind turbines spinning (so much reduced maintenance too!).
The government is delaying lots of permits till they can figure out how to change these perverse incentives... Needless to say, the wind industry isn't happy about the fact they might no longer get paid such large amounts, so they're demanding the old scheme be kept in place for existing producers for 25+ years, and having the new pricing rules only apply to new builds...
Have a look at the regions in for example Sweden which face similar bottlenecks in transmission capacity from north to south.
https://www.aemo.com.au/Energy-systems/Electricity/National-...
Australia and California are the poster children of why renewables are terrible for an electricity grid once they get past 10% of generation.
"brown outs on hot days" is straight up propaganda.
And at least having different pricing regions means that it's not investing in building useless generation where there isn't the demand or transmission capacity to move it to where it's required!
https://www.9news.com.au/national/energy-shortage-explainer-...
You're right. They just had to nationalize the market last year. The brownouts were the year before that.
The last major power outages to do with the grid were a couple of years ago here in Queensland when a large coal unit (Callide C unit 4) literally blew up, instantly taking a a bit over 800 MW of generation off the grid. Took like three hours to get large parts of the state back on. A year or so before that there was some minor load shedding in Victoria when two coal plants were down for unexpected maintenance over a heat wave (and I think another one or two tripped out in the heat) - and actually solar and wind from other states helped minimise that. Then there was the big one, where massive storms in South Australia took out transmission lines and a bunch of generators (including some wind farms) tripped off. Of course, despite being caused by the storm destroying transmission lines, the right wing did blame the wind farms for it...
I was a quant for one of the top 3 largest electricity retailers in Australia. A wonderful market where you take everyone's money as long as you call it green. It was shocking to see the liberal government tell the truth about renewables while labor and the greens are lying/in denial about them.
The market failure which required this extraordinary action was primarily the interaction of a particular cap price with two problems, both fossil-fuel related: the large increases in price of natural gas and coal due to the Ukraine war, and coal supply problems at several generators due to widespread east coast flooding resulting under the influence of La Niña . Most Australian gas and black coal is exported, so the domestic market is exposed to the internationally traded price. The gas prince increase in particular was so severe that the short-run marginal cost of gas electricity generators was above the administered price cap value. The widespread flooding also, somewhat ironically, constrained the output of some hydro generators as well, because there was no capacity downstream for more water release.
Certainly there are strong market design lessons from this, but they're around price caps and bidding behaviour. They're unrelated to the regional or nodal pricing concept which this thread was about (and there isn't really a renewable energy angle on this either).
Still don't know what brownouts you're referring to, and I follow the NEM pretty closely.
I say "most of" as South Australia is showing how it can be done, with over 70% of its energy coming from renewables whilst not being blessed with hydro [1].
[1] https://reneweconomy.com.au/south-australia-grid-with-the-mo...
You mean like putting in the worlds largest battery?
https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve?useski...
You're reaching levels or reality denial I've only seen in republican administrations projections about peace in the middle east.
I know I just don't understand the details but I'm always kinda confused about how hard it seems to be to dump excess power off the grid. Is it just really hard to build something that can use enough power even when it doesn't need to do any useful work?
It's just easier to not produce it. The issue with building up the grid is investment, but there is little marginal cost to turn off an existing plant.
This would presumably amount to building a slightly shorter but nevertheless very long cable on/under land. And I think it's much easier to just drop a cable under the sea than it is to dig and bury it under the ground or build pylons to carry it above the ground.
If you need to upgrade most of the links along the way, then building the longest possible cable at sea makes sense.
There might also be plans to tap off this cable to feed into portugal, spain, france and ireland along the way - that allows the cable to also take the role of some of the local transmission grid