The more interesting thing about the story is how several top government officials were fired as a result. That would never happen in the US, where decade-long delays are commonplace for train procurement.
The more interesting thing about the story is how several top government officials were fired as a result. That would never happen in the US, where decade-long delays are commonplace for train procurement.
This is false, government propaganda. https://www.antena3.com/noticias/sociedad/despedido-renfe-po...
That's just speculation to try to mitigate a colossal screwup.
This is not the first time when Spanish railway companies are caught trying to cover up the consequences of massive incompetence. For instance, the infamous Santiago de Compostela train disaster[1] was attributed to a careless train conductor going over the speed limit to impress a girl, which was a very convenient scapegoat to both ADIF and Renfe, but in truth the root cause as that both companies failed to deploy a mandatory speed monitoring and control system, which has been standard for decades.
[1] https://en.wikipedia.org/wiki/Santiago_de_Compostela_derailm...
I don't agree. This is a colossal blunder. Train clearance is a very basic trait of each railway line, along with track gauge. Ordering trains that you cannot even operate in your railway lines is perhaps the biggest screwup any railway operator can possibly make.
I'm not sure you fully understand the magnitude of this sort of screwup. Catching the problem in the design stage actually means it took the manufacturer to double-check the contract to realize his client did a gross unrecoverable mistake that resulted in their orders being fundamentally incompatible with their intended use.
The only clickbaity aspect of this article was tacking another notorious episode of Spanish mishaps which was their submarine design being fundamentally broken. It reads more like a cheap jab at Spain than anything else.
It’s a nonsensical state of affairs.
https://committees.parliament.uk/committee/153/transport-com...
https://www.newcivilengineer.com/latest/transport-bosses-adm...
HS2 is 100+ year infrastructure that massively improves the complete rail network of all of England and will allow England to go from backwards in terms of trains to having a fantastic overall network.
England is perfect for High Speed Rail, and rail in general. What they are missing is a few more Crossrail style projects (or S-Bahn style as we call it) in cities other then London, and more Crossrail in London.
I am advocating the same in Switzerland. We already have a great rail network, but one High Speed Line right across the major population part can improve overall rail infrastructure by a huge amount.
Switzerland has rail modal share of ~20% and with a new high speed line and a host of other things, that could be raised to 30-40%.
The capacity you gain on all the old lines for regional and cargo travel is huge.
This is just how public infrastructure projects in the U.K. work, I’m afraid.
Seems to me all the claims made about how it will fall short and be barley better then a old Victorian line is scare mongering to devalue the project and discredit the benefits it gives.
What is really sad is that the Greens are against it, what utter idiots. Hopefully you can elect some government that actually gets behind the project fully again.
> and then they’ll declare it unprofitable and beeching it, most likely
I don't believe that. NetworkRail was unprofitable, made public still exists. Franchise, unprofitable, made public again still exist. So the idea of these lines simply going away isn't really credible.