So simply plan really, overbuilt massively on renewables. Then build a while bunch of storage. And then also have inactive low utilization natural gas plants and infrastructure.
Germany will spend like 40 years building this massively complex production system with massive overcapacity of solar and wind, quite a bit of storage, natural gas backup and lots and lots of distribution networks to move around power everywhere requiring a massively complex to operate country wide grid.
Man o man, France in 70/80s solve the same problem with 60 technology and it took them less then 20 years. The mostly build the nuclear plants on sits of existing oil plants and didn't even need to make their grid complex. And they didn't even want to produce green electricity, they did it by accident.
Really hard to see what the better plan is. Germany could have literally had 100% green energy by now if the 'Energiewende' had gone with nuclear, but instead they will spend the next 20 years shutting down their remaining nuclear, then shutting down all their remaining coal, and also building more gas plants.
Brilliant plan really.