A swarm of robots built this tunnel [video]
youtube.com
youtube.com
Microtunneling has been around for years. It's done with small tunnel boring machines, to install pipes of various sizes.[1] The drives are usually not that long, because these are pushed from the starting point, not self-propelled like the big TBMs.
That's what they seem to be doing here. There's some hand-waving around the "special borepipes". Those are apparently drilled by existing techniques. Only when all those tubes are in place around the perimeter of the tunnel volume do the robots move in and grout. Trying to do all that pumped concrete grouting work with those small tubular robot vehicles is a neat trick. The animations show them drilling small crosswise holes longer than the tube diameter, which is a bit suspicious.
All this would seem to be limited by how far you can drive the "special borepipes" using standard drilling techniques. That can be quite a distance, though; the current microtunneling record is 2.2 km.[2] That's more than enough for most urban projects. You're going to want stations and access points along the route, so the drive can be done in sections.
(When watching the original post video, start at 3:30 to skip a long ad.)
[1] https://www.youtube.com/watch?v=teVrJs6CSe0
[2] https://www.napipelines.com/building-big-microtunneling-terr...
https://www.rocksoil.com/index.php/it/ricerca-e-sviluppo/22-...
The bore pipes in that project were much larger though, and became part of the tunnel supporting structure.
Besides the small test they showed in this video, the animations look a lot like "pure theory in ideal terrain", very likely this technique, if it will ever be proved actually viable, will be suited to only a few, and very homogenuous, kinds of geology/terrains.
First off you have to buy a load of strong and mechanically complicated robots (expensive), and then many small tunnels to put them in. Drilling these small tunnels won't be that much faster, and certainly no cheaper than one big one, assuming they're using conventional microtunneling equipment (required for the accuracy).
Also, what happens if a robot breaks down mid operation? Are you going to go fishing, or try and send in a human to dig it out? Worst case, you can't do anything and have to revert back to manual digging the whole way. You really don't want a timeline to blow up like that in a real project!
This system has the big advantage that everything is modular, so a bigger tunnel just requires more robot mini-tunnels. Economies of scale should make everything a bit cheaper, especially since the robots and mini-TBMs would be reusable.
Getting geology before you tunnel is also a benefit, but if this was so good, surely tunneling contractors would already do this by sending just one micro-TBM ahead of their main one! What can this system actually do if bad geology is detected? Not much...
Fundamentally the robots don't really solve anything except overcomplicating tunneling. You still have pretty much all the expensive parts (materials, spoil removal, planning, investigatory drilling, sinking shafts, etc) but now with the additional costs and uncertainty of having loads of robots too.
If you asked me to design a lining-first tunneling method, I'd completely ignore robots and try and use existing technology first. Take horizontal directional drilling equipment, make it cheaper and just directionally drill a ring of wells. Pierce the casing at a regular interval, and then fill the whole thing with high pressure grout. No robots needed and this happens everyday, just vertically rather than horizontally.
The robots do not seem specifically involved with removing spoil or even carving it into smaller pieces (at least pieces smaller than the tunnel diameter).
Does this mean building tunnel shells is the hardest part of tunnel building, not breaking up and removing spoil?
Or does this approach somehow make it easier to fragment and remove the spoil since it's now in tunnel-sized chunks?
(Edit: Yes, stabilising the tunnel is the hard part, see excellent and thorough answer by rmccue)
Modern Tunnel Boring Machines (TBMs) incorporate a tunneling shield, with the addition of a large machine behind the cutting head which builds the tunnel walls as it goes along.
The innovation here is to build the stabilisation first and tunnel out the rest; it seems more akin to pipe/box jacking [2] in that sense, where you basically force the outer walls through the material using hydraulics, then excavate the spoil. Their demonstrations so far are at the scale where box jacking would probably make more sense, but if they can deliver on the promise of having effectively an arbitrary long tunnel then that'd make the technique more broadly applicable.
[1]: https://en.wikipedia.org/wiki/Tunnelling_shield [2]: https://en.wikipedia.org/wiki/Pipe_ramming
https://www.rodio.ch/rodio-geotechnik-ag/pipe-umbrella-rodio...
Typically these are no longer than 18 meters and have a 3 meters overlap, there are limits in the precision of the drilling and to allow the "next" umbrella to start at the right height/width holes need to have a slightly open angle.
Even if it doesn't seem so to the casual viewer, drilling a (usually) 120-150 mm diameter hole 18 m long results in a non-straight hole due to the flexibility of the drilling rods and the possibility of deviations caused by the presence of different materials, it is not at all an "exact science" and there can be easily errors at the end of the 18 m hole of up to 50 cm or so.
There are of course techniques that allow to drill much straighter holes using external casings, like the type that seem to be used in the video, but they are much more complex (and costly), and anyway the precision of these is far from being "high", in case of long holes.
A lot of US cities could be retrofitted with subways.
Even NYC metro area badly needs a few more tunnels:
https://en.m.wikipedia.org/wiki/Gateway_Program_(Northeast_C...
Maybe. So far they have only drilled through wood and not stone.