Crossrail gets cross
diamondgeezer.blogspot.com
diamondgeezer.blogspot.com
Bring on HS2 next!
But yeah, I have flown with my bike quite a few times. It's mildly annoying.
The departure boards [edit: at Paddington rail station (note, not the tube)] will not label Elizabeth line trains with "Heathrow Airport", the TfL journey planner will not offer it to you unless you actively turn off National Rail options (i.e. Heathrow Express), etc.
This goes all the way back to when it was Heathrow Connect (does anyone remember that? Memories from my grad school days when it was approx. £6), and the fact that it was a continuing service to Heathrow always labeled as a small footnote near the bottom.
I somewhat wonder if they do this out of agreement with Heathrow Express, or more charitably interpreted as not confusing people. Either way it costs people who don't know otherwise.
My comment about the TfL journey planner is still the case though.
I’m not sure why TfL would want to actively push Heathrow Express over their own options, as they don’t have anything to gain, as it’s run by the airport and GWR / First Group, not themselves.
https://www.dreamstime.com/royalty-free-stock-photography-de...
https://www.flickr.com/photos/_mia/2437542452
I found it clearly enough at Paddington in the spring, though the signs at Heathrow for the cheap option were terrible.
You should read up all of the drama surrounding the purple line and the eventual sepulveda transit line in la. The issue: subway tunnel boring under a rich neighborhood. Fireworks ensue along with broken understandings of physics and geology but in the end, people used nonscientific arguments to delay the purple line extension in LA for 20 years (1), and are trying to use these arguments to kill a subway line (2) that would bore under a mountain and in no way shape or form affect the complaining rich Bel Air community above it. Somehow you don't hear a peep from the people in the hollywood hills living above the redline subway tunnel, nor see any affect on their property values from having a train move several hundred feet below the parcel offered for sale. Everything takes more money and a lot more time than it should to do anything at all, compared in years previous when people would generally see infrastructure and progress as a good thing.
1. https://www.lamag.com/driver/beverly-hills-finally-loses-cra... 2. https://www.curbed.com/2022/02/bel-air-subway-tunnel-los-ang...
They can build an mind glowingly insane 7 level loop clover with integrated rocket launcher and helipad but they couldn't design a safe and efficient pedestrian crossing if it smacked them in the face.
They are still planning new highways right threw actual real existing cities as if they were Robert Moses. Its literal insanity.
Its not for lack of investment that this project has been delayed over 100 years. Plenty of money has gone down that pit. There is a cost disease afflicting infrastructure in the US (and health care, and education).
*technically what I have is a transit diagram, not a map. The difference being it abstracts away the geography and angularizes all the lines.
Usually it gets tied up in years or decades of various fights like the St Croix Crossing which required federal action: https://en.wikipedia.org/wiki/St._Croix_Crossing
[34] https://en.wikipedia.org/wiki/I-35W_Saint_Anthony_Falls_Brid...
I'm a big transit nerd and it's very disappointing. As what should be table stakes, there is no realistic plan to get to 100% accessibility in NYC.
Let me save you some time Because we’ve been over this 1000 times… There are plenty of places in the United States with similar population densities as Spain, for example
A high speed rail linking up Liverpool to Hull sounds like a good idea, there are the Penniness to drill though, but it would hardly be the Gotthard base tunnel would it.
Pennine base tunnel anyone?
[update: this turns out to be a study for a road tunnel]
https://transportforthenorth.com/wp-content/uploads/trans-pe...
Liverpool to Hull would be transformative, as would an improved service to London.
But the Leeds leg of HS2 was (predictably) one of the first things to be cut, so I wouldn't expect either to happen any time soon.
Midlands Connect cover some of the gains they’ll get in these docs https://www.midlandsconnect.uk/publications/hs2-released-cap...
Those gains are part of the reason HS2 should go all the way to Scotland and why the Northern Powerhouse route from Hull to Liverpool should be built too
Why would one think that? Everything we see suggests returns are compounding rather than diminishing.
As a Return on investment, every pound spent in the south east on infrastructure returns 5 times or more in the local economy compared to the rest of the Uk, which is how these projects are prioritised.
https://www.gov.uk/government/publications/hs2-phase-one-ful...
Not that I'd be optimistic if I lived up north, but maybe a bit more hopeful that with previous Tory lies about wanting to level up any part of the country.
The only thing he may be forced in to is lying about it.
It's not absolutely perfect. The absence of step-free boarding at the stations shared with National Rail infrastructure is unfortunate, and some of the interchanges with other lines involve annoyingly long paths. But these are compromises and I really hope some of them can be rectified in the future. But the design of the stations, the lighting, the trains… just all absolutely first-rate.
Plus it's also yielded some good suggestions on some places to visit in (or occasionally even outside of) London.
(You might first want to view this video as background for context: https://www.youtube.com/watch?v=BnNIzCUg9G4)
(I'm going to leave the iPhone suggested spellcheck).
Marshall is very much a Person Who Likes Trains, and in the video he talks with others of that ilk.
I find it funny that the first underground railway in London was built in a little over 2 years....by hand.
We really should do more elevated rail, which is a lot cheaper than digging.
https://www.researchgate.net/figure/3D-model-view-of-Bond-St...
You can't dig up the area around Bond street and close down existing tube services during construction. (The crossrail tunnels run under some existing lines.)
EDIT: This map[1] suggests you could do Norwich -> Birmingham New Street -> Bristol Temple Meads. Without having to go through London, I suspect this is indeed possible without changing trains, even if no operator runs that route.
[1]: https://www.thetrainline.com/cmsmedia/cms/9384/national-rail...
In practice, no - different train companies operate all 3 lines
Great Western Railway operates the Great Western franchise which incorporates much of south wales and south west of england - Including the Great western mainline. Abellio Greater Anglia operates most services on the Great Eastern Mainline
As for permissions I don't know if the crossrail core section has exclusivity granted to TFL (or its subcontractor MTR Corporation), given it's run as a concession this may be the case.
From the West end of the line in Reading nobody takes the Elizabeth Line to go into London, for instance, it's much too slow compared to the direct fast GWR trains.
This also means that the line probably cannot be shared with fast trains for direct routes from East to West, I think.
You're correct, fast intercity services and the stopping crossrail services likely cannot coexist.
But technically it is possible, assuming the requisite signalling standards are met by the rolling stock intended to be used. It's possible that only the Class 345 and Thameslink's Class 700's can meet this requirement currently.
freight trains will be doing that complicated bit every day