Samsung Kicks Advanced-Chipmaking Race into High Gear with Road Map
wsj.com
wsj.com
TSMC being a node or 2 ahead has basically let them hold their customers by the balls, forcing them to take price increases and extreme lead times because there’s simply nowhere else to go for the same quality and performance. It would be great if we got to a place where we had 3 foundries on roughly equal footing, especially for national security and global supply chain robustness. But also because competition is good for us mere consumers as well, of course :)
Take a look at how Russia attempted and failed to scale up semiconductor fabrication into the 1980s and 1990s. They weren't 2 nodes back. They were WAY further back than that, and even today are still struggling to bring online nationally-developed fabrication technology of which the equivalent has existed elsewhere for 20-30 years.
China's SMIC is going to be bringing on "7nm" soon, despite being unable to purchase EUV equipment due to sales embargo. I can't imagine the effort that was required to make 193nm DUV machines produce chips reliably with a "7nm" feature size. EUV isn't required, but it surely makes things much easier.
Also even for non-military uses, if all of that market switched to foreign semis, it’d cause a lot of economic problems if we couldn’t import foreign semis any longer. Absent an embargo or war, that still gives countries that produce the better semis a lot of leverage.
2. RoadMaps ( at least one like this ) are for investor only.
3. Samsung is also the reason why we have "nm" numbers that dont at least correlate to something. ( 99.9999% of the Internet blame TSMC for it ) And those numbers you see on roadmap means nothing.
4. But credit where credit is due Samsung is very serious about catching up to TSMC. Their total investment numbers dont lie.
IMO There simply isn't enough space for three leading edge Foundry. So either Samsung or Intel will have to let go. And Intel currently has the upper hand in terms of geopolitical and business backing. Which is what I think this article and PR to investor is all about. Samsung is not giving up without a fight. ( And why there are rumours about Samsung buying ARM from Softbank )
I thought the reason for this is that the quoted nm numbers in a modern process node where pretty much for the most optimal kinda gate in the most dense layout (maybe something like SRAM?).
You could probably still find some useless metric that fit the narrative. But that is beside the point.
That is the word I am looking for.
> That used to be the case until Samsung start playing around with the number a little bit more for marketing, and the whole market force TSMC to follow, and after a few cycles we left with nothing but a name with numbers.
Huh I didn't know that, does anyone publish min feature sizes for modern process nodes?.
It's no different from when some company gets articles saying "X will destroy Y!" when Y is shipping, and X is 6-12+ months out, assuming no schedule slippage.
it's not like Intel made it hard in the last decade either
At this point Apple won't work with Intel, because their M1/M2 is so much better than Intel's chips, why give them process experience and transistor-level knowledge of how the M1 is structured, designed, and performs?
Apple probably has the TSMC execs fully adapted to their culture of secrecy. Samsung and Intel would probably never cave to that properly: Samsung is their main smartphone competitor, and Intel is their competitor in desktop and probably ARM in the future.