There needs to be a third track. IC (training in the mountains), EM, and IC (planning and design). A lot of orgs would call that last position a PM, but I have never worked with a PM competent enough to actually carry out that kind of work without ICs stepping up to do most of the PMing themselves.
In my experience, PMs are the corrupt bureaucrats that serve as antagonists in wuxia stories.