I assume the host moves, not the disks. My next assumption is that the host moving would involve downtime for the host, so no need to bother simulating some hotplugs.
(I know that live migrations are at least in theory possible, but I don’t know why GCP would go through all the effort)
(I’m also making a lot of assumptions about things I am not an expert in)