It also has an advantage over soil that the remaining bits don’t need much extra support for the load above. This doc talks about it: https://stateimpact.npr.org/texas/2012/11/21/why-texas-doesn...
There's other issues, too, such as the lake that runs through the middle of the city, the underground rivers and cave networks in the area, and the unstable clay on the East side of town that expands and contracts with rain, causing all sorts of problems.
I don’t have sources myself but to me the porous nature of limestone seems like a benefit since water would easily flow to the water table instead of flooding in the tunnel.
Erosion seems like it would be a far bigger problem for tunnels in soil or sand than it would be for limestone.
Limestone, because it dissolves in contact with acidic water (and rainwater is slightly acidic) is also prone to sinkholes. Best to keep the ground stable by not exposing it to more water. It happens so often in Florida there’s an FAQ page. https://floridadep.gov/fgs/sinkholes
Excavating limestone isnt that hard. Instead of one day to dig a basement in soil, it would take about 14 days to dig a typical basement in limestone (based on digging pools in limestone). It costs about 1500/day for the crew/equipment so an extra 21K for the excavation.
East austin has no limestone and basements are still rare.
East Austin doesn't have them because of the unstable clay that expands and contracts with rains, same reason the track surface at COTA has had so many issues. The ground doesn't stay put.
Couple those things with the frost line issue you mentioned, along with the likelihood of flooding, and it probably comes down to the fact that it's just too much work to be worth it.
If you did, land would be worth $21k less per lot - to make up for the cost to dig a basement.
Which is why most people water their foundations to ensure the soild maintains steady state of dampness- rain or shine.
In Minnesota, where I live, basements are definitely a byproduct of structural requirements. You have to dig 48 inches so that your foundation is under the frost line. But also consider that you don't want your front door to be at ground level, because then it might not open after a massive snowfall. So if you add up all that vertical space, you get about 7 feet, which is about the ceiling height of an unfinished basement.
Its worth noting you can generally still drill a hole into caliche.
I think once cities get older and more ossified in their shape is when basements start to appear.
Assuming there is no other reason to avoid it like flooding, hard rock, earthquakes, etc.
To me that sounded fishy but I looked it up and you seem to be right! https://www.brownstonedetectives.com/the-ancient-art-of-movi...