Perhaps you could make a device that rides on one rail while painting the other one. Flip it around and do the other side when you’ve done the first pass.
This is why astronauts use a pen. Sometimes the "cheap and simple" way has side effects that are more harmful than the original problem.
- The paper peeled away is a fire hazard
- The oil and wax writing smudges and is a terrible way of writing
- The floating bits of paper from sharpening the pencils was a mess and since they float, got in people's faces.
Generally those are terrible ideas too, especially compared to a $100 for a pen. It's really not that much compared to every other cost.
https://www.scientificamerican.com/article/fact-or-fiction-n...
Probably that approach to safety was cause for it.
Meanwhile, I notice that all the replies to the UK video are people complaining about the rail system reducing headcount and mocking the idea that this task could be automated.
And among other things changes like not being paid for their commute when doing overtime(which was paid for previously), at the time when petrol has crossed £2/L around the country.
Painting will obviously have to happen at night (double pay), and is risky work (double pay again). Oh, and we can't do more than 3 hour shifts because it involves bending down. And we'll be needing a minimum crew of 8 - 1 painter, 1 safety expert, 1 signalling expert, 1 electrics expert, 1 spotter, 1 paint quality expert, a foreman to lead the team, and a union rep to check everything is done according to the book. Oh, and wherever the work is being done more than 15 minutes from a toilet, we'll need a mobile toilet booked and installed, as well as a break room. If any of those people are missing or late, we'll cancel the work and retry in 3 months.
BART and Muni are both union shops. I don't know if SMART is but it postdates the HSR proposals.
As someone who lived through Muni's transition to SelTrac (the system that underpins DLR and I think some of the Tube lines) I can say the union was not the problem. The technology was unreliable and eventually abandoned by Alcatel/Thales. GoA 4 stuff is only viable along small, low ridership stretches of track. If you knock the level of automation down a peg or two it's a lot easier to scale up to busier/larger systems.
Hah! Typical free market libertarian approach that cuts corners. You can't just go out and start painting stuff matey! What about the viability study? Someone needs to build a model of the processes, and conduct a pilot time and motion study. People won't just accept white rails without consultation. Where's the perception management and transformation campaign to make sure the new white theme is on message and brand aligned for Railtrack? You'll have to add at least 1 lawyer, 1 community liaison officer, 2 PR people, an advertising account executive...
> we'll need a mobile toilet booked and installed
Toilet? Pfff. You can't just go out and stick up a toilet....
We've had many industrial accidents, from Bhopal's disaster to Boeing Max, thousands of people died, and all of them were caused by management meddling where they shouldn't. none of them were caused by unions
What needs to be painted is the sides of the rail, the top - even if painted in the process - will return to lucid metal as soon as the next few trains pass on them.
Usually small trucks (Unimogs adapted to rail use) or small convoys are used, see: