I happened to be living in London in the early 2000s at the inception of the project and I can remember reading in 2003 the expected opening date was 2017. There was some delay in planning (of course) and we've had Covid so realistically this estimate was only 1-2 years off. That's a staggeringly successful estimate.
Then we get to the cost. Estimated ~15B pounds. Actual cost is what? 20B pounds? Again, that's honestly not that bad.
But I guess my perception is coloured by the Second Avenue Subway, which spent almost as much for 3 miles of tunnels compared to >25 miles of tunnels (under a 2000+ year old city, no less), a bunch of new stations and upgraded rails.
One weird thing I noticed from looking at photos of the new stations. One thing I liked about the Tube was most stations had 3 sets of escalators together. This is massively beneficial. You typically have 2 up (for passengers disembarking) and 1 down. Why? People disembark in huge bursts and arrive relatively smoothly. Also, when you need to do maintenance you shut down one and still have 1 up and 1 down. But I've seen some photos of the new stations where there appears to be only 2, which is surprising and disappointing.
Still, I look forward to this opening and I consider the whole project a massive success.
https://twitter.com/nocontextbrits/status/141631491606828237...
Ironically, I'm probably doing this myself right now - I guess people do this everywhere?
But they love to complain about long repairs of tram tracks and streets on the surface, and they have a point. Repairs are usually tendered by cost only [0] and they tend to stretch for months, with very low energy effort made (e.g. you won't see any workers on the spot for days, because the tendered construction company has other jobs to do and no incentive to speed things up).
[0] A nasty aftereffect of the "Great Anti-Corruption Revolution" of the early 2010s. Everyone in the public sphere is afraid to buy but the cheapest things and services. Investigations dragging for years are a punishment themselves, even if you are acquitted at the end.
The reason why Crossrail got shit on for their estimates is because they were still pushing the "on time and on budget" slogan just a month or so before it got delayed which was just a few months before it was meant to open.
Everyone expects large projects like this to overrun a bit, but if you start bragging about it then you better be right.
December 2018 was the opening date [0];
24 July 2018: Department of Transport update [1]: On time and we are so great we managed to barter them down by 2.5bn on the cost. This will enable the completion of the project at a cost lower than planned under the last Labour government.
31 August 2018: It is announced that Crossrail's opening had been delayed by at least nine months to autumn 2019.
April 2022: It still isnt open...
I get shit happens, but how can you be on track 6 months away from opening and 4 years later you are still an unknown time away from opening.
[0] https://assets.londonist.com/uploads/2018/08/i875/20180831_0... [1] https://www.gov.uk/government/speeches/annual-update-on-cros...
Considering the UK gov announced 7B pound to improve transportation for _the rest of the UK_, the 5B overrun is put in perspective.
“Amazon is Coming, Can NYC Transit System Handle It”
https://www.nytimes.com/2018/11/20/nyregion/amazon-new-york-...
The deal fell through and now everyone has to drive to the new Amazon headquarters.
Though sporting events still overwhelm the system albeit for an hour or so.
After a decade of upgrades the Met line suddenly had extremely frequent signal failure (around 2019ish) and ran a service that felt considerably less reliable than 2007 before upgrades began.
Places like Singapore, Hong Kong and Tokyo run like clockwork. I also feel like the DLR runs better but I don't take it often enough to intimately know its failure rates.
Is it just the curse of legacy infrastructure?
Also, they are trying to install a new signalling system, and during testing two trains collided: https://www.railjournal.com/signalling/contractors-responsib...
Curiously DLR (and Jubilee and Northern lines) use the same system.
Just bundles on bundles snaked alongside track, bulging out of channels meant for them... Is it any wonder there's been a half dozen point or signal failures over the last few weeks leading to significant delays for commuters?
To say nothing of how much left over track sections, sleepers, gravel bags and other material are strewn alongside the lines, left for years.
I am sure I have seen enough lengths of track seemingly discarded along the lines to build entire rail networks.
When I visited the UK and London, railways and the tube were so nice compared to having to drive everywhere where I live in the US.
Crossrail, new longer trains a few years back in London. Paris similarly built a new metro line (14), extended it a lot, is a building a whole bunch of new metro lines ( Grand Paris Express) to better serve the suburbs, and is improving signaling to make trains more frequent. And of course lots of alternative infrastructure like proper biking lanes.
The biggest issue for which there isn't yet a good solution is air quality in old tunnels, but masks probably help with that.
You will have to stand during the rush hour, but the subway trains aren't hopelessly overflowing.
But as a staunch introvert with a fresh Garmin watch, I try to walk as much as possible anyway. Those 10 000 steps do not make themselves.
[1] https://www.ft.com/content/6f381ad4-fef7-11e9-be59-e49b2a136...
The platforms have doors, ostensibly this allows trains to enter stations faster, but also would keep out break dust from getting onto the platforms, as well as reducing suicides (a grim feature of commuting in the run up to Christmas)
I suspect the new seating is cheaper, lighter and easier to maintain, and they can cram more of them in.