It feels like this should be titled something more to the effect of, "watch a bridge section be constructed on site and then installed over the span of a year." Noting it as "replaced in three days" feels wildly inaccurate.
The title feels informative to me.
All in all that's a pretty low amount of time; often these are done by closing the road under for an unspecified amount of time, diverting all traffic onto one bridge span (reduce to one lane in each direction) and replacing the bridge a half at a time.
So all that matters is people watching it on TV?
I disagree much, because building site was there for months and road below was hindered all the time. Highway was maybe operating without closing lanes but that is not the full story there.