Sort-of. Transmission for HTHV lines (745kV single circuit cost $2.5-4M/mile with ~1% line loss; 345kV single circuit will cost ~$1.5-2M/mile with 5% line loss). For 1MW solar capacity you typically need about 4 acres. 100GW of solar would require 400k acres of land - and come at a cost of about $3 billion for the panels, not to mention the price of land or entitlements. Add in cost of substations and transmission you’re realistically looking at a $10+ Billion project. Which while doable would not profitability compete with other grid solutions. If panels drop by another 30% and power densities improve the grid will naturally tend towards that direction.