The $11BN Tunnel Connecting Scandinavia to the Mediterranean
youtube.com
youtube.com
They're digging a 64km long tunnel through the Alps - so technically it does enable a connection of Scandinavia to the Mediterranean. But it's not a tunnel from Scandinavia all the way to the Mediterranean like the title implies.
You could also say it connects Latvia to South Africa ...
How can it be that they don't mention "Brenner Base Tunnel" anywhere in the description? It must be on purpose. Are they somehow gaming the YouTube algorithm such that it won't be able to categorize it in any specific bucket?
> The $6 billion price tag for phase two works out to $2.2 billion per kilometer. That would make it the world’s most expensive subway project on a per-kilometer basis, narrowly surpassing phase one of the Second Avenue Subway, which clocked in at “only” $1.7 billion per kilometer.
Let's compare that to Crossrail, which goes under London, a 2000+ year old city notorious for hitting Roman ruins where the only real solution is to dig deep (ie even more expensive) [2]:
> Crossrail was built in the heart of London to similar standards to New York Projects at $500M per mile.
[1]: https://www.vox.com/policy-and-politics/2017/1/1/14112776/ne...
[2]: https://tunnelingonline.com/why-tunnels-in-the-us-cost-much-...
Clearly tunneling under a city is a very different proposition from tunneling under a mountain range. And I'm willing to bet that a significant part of the cost is not per km, nonetheless it's just another example of the crazy cost of civil engineering in the US
But that's completely ignoring any geological differences of course, so not very realistic.
I could imagine that there are several other features of a tunnel that might affect its price considerably: cross-section dimension, number of pipes, technique of construction, security installations, ventilation, the type of use (rail, automotive, both), ...
For example, the Fehmarnbelttunnel/Femern Bælt-tunnelen you mentioned will consist of four pipes for both, rail and automotive, and is not drilled but built out of prefabricated modules (42m x 9m x 217m) made of concrete placed in a trench on the seabed and then covered with stones and sand.[1]
[1] Source: https://de.wikipedia.org/wiki/Fehmarnbelttunnel (in German)
That’s $1.03/km, no?
We keep getting guilted for flying everywhere, but projects like this are needed to make the alternatives practical.
Projects like this are needed for very specific cases, like this. Not "everywhere", so yes you get guilted for flying everywhere when it is not necessary.
The equivalent air transport was ~$100 and shaved off maybe 30 minutes once you factored in all of the transfer times etc.
Do you have a better medium-length video content producer about large civil engineering projects? I'd be interested to watch.
> From the title I expected this to be about the Fehmarntunnel between Denmark and Germany.
Here's the b1m video about that project: https://www.youtube.com/watch?v=JLBv87VulPM
Or, before Russian saboteur and/or missiles take it out? They could take it out immediately... but they probably have closer and more important targets to point their missiles at.
You could blow up some point, perhaps the two entries. But repairs are then comparable to when the two entries of any minor tunnel have been blown up. Doing any sort of damage that scales with the cost of the tunnel seems difficult.